Inspections for the day of: Tuesday, January 8, 2008.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02431 BLD-Final1/8/20081/8/20081/9/2008 11:31:27 AMPNR
don Phone #: ###-####
MIS06-00115 MIS-Aging Inspection1/8/20081/8/20081/9/2008 11:30:31 AM PEND
BLD02-02176 BLD-Aging Inspection1/8/20081/8/20081/9/2008 11:28:09 AM PEND
MIS06-00025 MIS-Aging Inspection1/8/20081/8/20081/9/2008 11:27:47 AM PEND
BLD07-02022 BLD-Energy code compliance1/7/20081/8/20081/8/2008 2:49:20 PMPPASS
eric Phone #: ###-####
BLD07-02021 BLD-Energy code compliance1/7/20081/8/20081/8/2008 2:48:27 PMPPASS
eric Phone #: ###-####
BLD04-02200 BLD-Conference1/7/20081/8/20081/8/2008 11:38:21 AMAPASS
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-####
structural ok now,, met w/ Sarah the struct eng..
BLD04-02200 BLD-Final1/8/20081/8/20081/8/2008 11:37:06 AMPPASS
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-####
BLD04-02200 DOC - Permit Finaled1/8/20081/8/20081/8/2008 11:36:22 AMPPASS
BLD07-01436 BLD-Conference1/7/20081/8/20081/8/2008 11:07:38 AMAPASS
Brad Please call 20 min before going out Phone #: ###-####
ok to move post over in basement for shower control,, load is carried through beam above
BLD07-01047 BLD-Final1/7/20081/8/20081/8/2008 10:25:50 AMANR
call 1st before insp -- dan Phone #: ###-####
need zoning
MIS08-00003 BLD-Conference1/8/20081/8/2008 P 
Louise ###-#### 2ish if possible that's when Eric from plumbing will be there