BLD08-02562
| BLD-Footing | 1/8/2009 | 1/8/2009 | 1/8/2009 9:20:53 PM | P | PASS |
|
|
jay Phone #: ###-#### Mono Pour Foundation and slab OK
|
BLD08-02467
| BLD-Final | 1/8/2009 | 1/8/2009 | 1/8/2009 4:08:00 PM | P | NR |
|
|
michael Phone #: ###-#### Need erosion Control final.
|
ESC08-01040
| Site Preparation | 1/8/2009 | 1/8/2009 | 1/8/2009 2:21:43 PM | P | PASS |
|
|
Jay cge-ahfg
|
ESC08-01007
| Site Final | 1/8/2009 | 1/8/2009 | 1/8/2009 2:15:04 PM | P | FAIL |
|
|
Talked to RP...bdf-ihci Need to sweep asphalt.....
|
BLD08-01056
| BLD-Final | 1/8/2009 | 1/8/2009 | 1/8/2009 1:42:53 PM | P | PASS |
|
|
30 min lead and I can meet you out there if you like. We got fire final today and everything else is signed off. Phone #: ###-#### Internet Inspection Request from: Nick Downing OK for Perm Occ.
|
ESC08-00922
| Site Final | 1/8/2009 | 1/8/2009 | 1/8/2009 1:33:52 PM | P | PASS |
|
|
|
ESC08-00922
| Site Final | 1/8/2009 | 1/8/2009 | 1/8/2009 1:33:34 PM | P | PASS |
|
|
|
BLD08-02267
| BLD-Final | 1/7/2009 | 1/8/2009 | 1/8/2009 1:32:50 PM | A | PASS |
|
|
ammon Phone #: ###-#### OK for Perm Occ.
|
BLD06-01198
| BLD-Conference | 1/7/2009 | 1/8/2009 | 1/8/2009 1:27:47 PM | A | DONE |
|
|
mike Phone #: ###-#### Verify anchor bolt locations to allow for Pre- manufactured wall panel constr.
|
BLD08-00435
| BLD-Final | 1/6/2009 | 1/8/2009 | 1/8/2009 9:31:43 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/6/2009 at 1:58:08 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2009 9:31AM.
|