Inspections for the day of: Friday, January 8, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00428 BLD-Aging Inspection1/8/20101/8/20101/14/2010 1:02:58 PM CANC
BLD09-02071 BLD-Energy code compliance1/7/20101/8/20101/8/2010 4:17:03 PMPPASS
Jim Phone #: ###-####
BLD06-00535 BLD-Final1/7/20101/8/20101/8/2010 4:16:43 PMPFAIL
Skip Anderson Phone #: ###-####. Provide HC signage at restroom, and lever hardware on doors at furnace room. Life/safety also failed.
BLD09-01459 BLD-Final1/8/20101/8/20101/8/2010 2:59:29 PMPPASS
BLD09-01459 DOC - Permit Finaled1/8/20101/8/20101/8/2010 2:58:43 PMPPASS
Demo is completed. All requirements were met.
BLD09-00737 BLD-Framing/Rough-in1/8/20101/8/20101/8/2010 2:52:09 PMPPASS
Fire wall construction inspection please-Jim Phone #: ###-####. BAse and face layers of 5/8 type x rock at overbuild section. Also verified fire rated ply at 4ft. laydown parapet area.
BLD09-00738 BLD-Framing/Rough-in1/8/20101/8/20101/8/2010 2:49:56 PMPPASS
Fire wall construction inspection please-Jim Phone #: ###-####. Base and face layers of 5/8 type x rock at overbuild and 2nd. floor to underside of roof.. Also verified fire rated ply at laydown parapet.
BLD09-01007 BLD-Footing1/7/20101/8/20101/8/2010 11:31:08 AMAPART
rod//request early as possible Phone #: ###-####. Exterior column pad footings for new canopy at existing retail shops. Will have special insp.