FIR09-00510
| FIR-Aging Inspection | 1/8/2013 | 1/8/2013 | 1/9/2013 9:40:47 AM | | NR |
|
|
wip
|
FIR12-00744
| INSP-Final Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 3:48:09 PM | P | FAIL |
|
|
The new 15cd strobe in the corridor is overspaced. Also notification needs to be extended into the corridor in front of the restrooms since the door that is shown on the building plans has not been installed. No testing was actually performed. All other spacing within the tenant space appears ok. Tim and I discussed options.
|
BLD12-02323
| FIRE-Final Inspection | 1/7/2013 | 1/8/2013 | 1/8/2013 2:49:55 PM | A | PASS |
|
|
Life safety passed.
|
BLD12-03228
| FIRE-Final Inspection | 1/7/2013 | 1/8/2013 | 1/8/2013 9:31:10 AM | A | FAIL |
|
|
Provide automatic flush bolts for the main exit inactive leaf or remove all hardware to meet the exception. Provide sticker at door. Provide fire extinguisher as discussed. Contact plan review to verify that only one restroom is needed since one of the two shown on the plans is missing.
|