FIR13-00011
| INSP-Final Inspection | 1/2/2014 | 1/2/2014 | | P | |
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00504
| INSP-Sprinkler Rough-in | 1/7/2014 | 1/8/2014 | 1/9/2014 7:18:20 PM | P | PART |
|
|
Overhead work approved for cover at the grid ceilings.
|
FIR13-00509
| INSP-Sprinkler Rough-in | 1/7/2014 | 1/8/2014 | 1/9/2014 7:17:29 PM | P | PART |
|
|
Fire sprinkler work okay for cover at the grid ceilings.
|
BLD13-03484
| FIRE-Final Inspection | 1/8/2014 | 1/8/2014 | 1/8/2014 3:34:22 PM | P | PASS |
|
|
Noted correction items verified for completion. Life safety passed.
|
FIR13-00673
| INSP-Sprinkler Rough-in | 1/7/2014 | 1/8/2014 | 1/8/2014 3:33:19 PM | A | PART |
|
|
Overhead fire sprinkler system modifications per the scope of permit work are complete. Final pending verification of spacing once partition walls are built per plan.
|
BLD13-02116
| FIRE-Sprinkler Rough-in | 1/8/2014 | 1/8/2014 | 1/8/2014 3:30:46 PM | A | PART |
|
|
Overhead fire sprinkler work okayed for cover.
|
FIR13-00526
| INSP-Final Inspection | 1/7/2014 | 1/8/2014 | 1/7/2014 3:49:08 PM | P | CANC |
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|