BLD13-00904
| BLD-Conference | 1/8/2014 | 1/8/2014 | 1/9/2014 8:43:48 AM | P | NR |
|
|
Pre Inspection walk with Dave H. and Roger W. 17th Floor Zions space.Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson still working
|
BLD13-01783
| BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 8:42:14 AM | P | PART |
|
|
Ceiling grid inspection requested by Murph, PM, 16th Floor H&H. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to place bourder tiles in
|
BLD13-01782
| BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 8:41:13 AM | P | PART |
|
|
Ceiling Grid Inspection request Per Murph. PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to place bourder tiles in.
|
BLD13-03561
| BLD-Final | 1/8/2014 | 1/8/2014 | 1/9/2014 8:13:31 AM | P | PASS |
|
|
Ryan Phone #: ###-####
|
BLD13-01633
| BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 8:12:39 AM | A | PASS |
|
|
Ceiling Grid Inspection, AM Wednesday, Ruths Chris, Per Mike Beeson. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD13-00938
| BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 8:11:54 AM | A | PART |
|
|
JIM apt first floor Phone #: ###-#### needs to finish fire spray on rock wool floor infills
|
BLD13-00889
| BLD-Ceiling Grid Inspection | 1/8/2014 | 1/8/2014 | 1/9/2014 7:06:08 AM | P | PASS |
|
|
Request for Zions First Floor Ceiling Grid inspection, requested by Roger. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD13-01733
| BLD-Conference | 1/8/2014 | 1/8/2014 | 1/9/2014 6:13:25 AM | P | PART |
|
|
Pre Final Walk with Dave H and Roger W. on 6th Floor, Zions Bank. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD13-01731
| BLD-Conference | 1/8/2014 | 1/8/2014 | 1/9/2014 6:12:19 AM | P | PART |
|
|
Zions 7th Floor Pre Final inspection walk with Dave H. and Roger W.Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD11-00961
| BLD-Other | 1/8/2014 | 1/8/2014 | 1/8/2014 12:00:00 AM | A | PART |
|
|
Verified Glazing, panic hardware, exit sign and threshold elevation on exterior doors at patio area all were in compliance. Will have a zoning enforcement visit to require zoning approval for plan modification in patio area.
|