ESC14-01030
| Random Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 5:09:38 PM | P | PASS |
|
|
Permit posted. No trackout from site. BMPs installed.
|
ESC14-00499
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 4:28:20 PM | P | PASS |
|
|
WIP on Campell Co. No trackout to McGregor, no discharges. Permits posted. Limited activity at time of inspection.
|
ESC13-00524
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 3:00:38 PM | | PASS |
|
|
No hillside erosion issues in the seeded areas. Limited trackout to streets, significant amounts of sand in road from winter driving safety applications.
Individual SFHs in progress with permits posted. Drop inlets protected and no issues within the stormwater retention/infiltration ponds. No corrections at this time. Will continue to monitor.
|
ESC14-01028
| Tracking Control | 1/8/2015 | 1/8/2015 | 1/8/2015 1:27:24 PM | P | PASS |
|
|
Follow up on CN from 1/7
Stockpiles have been backfilled around foundation and the sidewalk, street, and gutter have been cleaned as requested.
Corrections complete. Approved.
|
ESC14-00289
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 11:58:35 AM | | PASS |
|
|
Home complete. Permit open for revegetation. No ESC violations observed.
|
ESC14-00284
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 11:58:16 AM | | PASS |
|
|
Home complete. Permit open for revegetation. No ESC violations observed.
|
ESC14-01035
| Random Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 11:55:22 AM | P | PASS |
|
|
WIP. Hole is dug, stockpile stored appropriately. No sediment leaving site or erosion in the drainage channel. Wattle trenched in at discharge point.
|
ESC14-00135
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 11:52:29 AM | | PASS |
|
|
WIP. No hillside erosion ongoing. Culdesac in decent conditions. Roofing crew keeping vehicles off mud. No corrections at this time.
|
ESC13-00684
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 11:44:13 AM | | PASS |
|
|
Antelope Springs subdivision development has BMPs installed and there is no construction activity for subdivision currently. Individual SFHs in progress with seperate permits. Will work with builders to get Parsnip Peak culdesac cleaned since there is some trackout and loose sediment on hard surfaces.
|
ESC14-00980
| BMP Violation | 1/8/2015 | 1/8/2015 | 1/8/2015 11:41:57 AM | P | FAIL |
|
|
Corrections needed:
Clean up uncontained scrap wood. Sweep sidewalks and gutters. Coordinate with development to sweep Parsnip Peak.
Conditions not good for clean up activities, so will re-inspect next week for corrections.
|
ESC14-00629
| Tracking Control | 1/7/2015 | 1/8/2015 | 1/8/2015 11:31:25 AM | A | NR |
|
|
follow up on corrections. Check DI bags and that wattles are trenched in.
Corrections not complete. Some sweeping has occured and wattles have been brought to site.
Need to finish sweeping, install/trench in wattles, and switch out DI bag.
Part of issue is that the ground is mostly frozen. Will check back tomorrow.
|
ESC14-01134
| Tracking Control | 1/8/2015 | 1/8/2015 | 1/8/2015 11:18:32 AM | P | FAIL |
|
|
Excessive mud and dirt tracked by vehicle and foot traffic.
CN issued to Morgan with Hayden Homes to clean up site once conditions dry out/improved. Frozen & thawing cycle making tough to control. Stormdrain DI has filter protection. No active discharges, but needs to be cleaned/swept and BMPs installed as necessary ASAP.
Morgan agreed to work on cleaning up Snow Bird and Black Gold this weekend & next week.
|
ESC13-00552
| Tracking Control | 1/8/2015 | 1/8/2015 | 1/8/2015 11:01:59 AM | P | FAIL |
|
|
Due to increased construction activity and muddy conditions, roads are very dirty and muddy. When conditions dry out and round of foundations are complete, the following corrections are necessary:
Corrections: 1. Street sweeping (all streets) 2. Check storm drain inlets for onsite system 3. Remove/restore concrete washout
Discussed corrections with Hayden Homes and Eaglewood Homes who will be coordinating with subdivision developer Brad.
|
ESC14-00675
| Aging Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 10:57:20 AM | | PASS |
|
|
Home complete, yard is landscaped, and all other permits finaled. ESC permit conditions satisfied.
|
ESC14-00675
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 10:56:24 AM | P | PASS |
|
|
|
ESC14-00913
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 10:50:41 AM | P | PASS |
|
|
Home complete and landscaped. Site has been cleaned and swept. ESC permit finaled.
|
ESC14-00816
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 10:49:37 AM | P | PASS |
|
|
Home complete and landscaped. Permits finaled. ESC conditions satisfied.
|
ESC14-01137
| BMP Violation | 1/8/2015 | 1/8/2015 | 1/8/2015 10:46:16 AM | P | FAIL |
|
|
Excessive trackout and dirt/mud leaving site on intersection. No stormwater flow/discharges occuring currently, but needs to be cleaned. Foundation crew is onsite working.
Correction Notice issued to Hayden Homes to clean up mess, check drop inlets, and sweep street once the two house foundation are installed.
|
ESC14-00206
| Random Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 10:43:11 AM | P | PASS |
|
|
New SunnyRidge phase is currently shut down for winter. No runoff from site, water is ponding and infiltrating in various areas. Entrances are blocked to prevent trespassing/track out. No corrections at this time.
|
ESC14-00971
| Random Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 10:33:21 AM | P | PART |
|
|
WIP. Permit posted, trash contained and no significant sediment trackout.
Correction required:
Perform maintenance and reinstall the drop inlet filter bag in front of house. It is >50% full
|
ESC14-00619
| Aging Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 10:13:05 AM | | PASS |
|
|
Home completed, landscaped, and occupied. ESC permit conditions met. All permits finaled.
|
ESC14-00619
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 10:12:27 AM | P | PASS |
|
|
|
ESC14-00620
| Aging Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 10:12:17 AM | | PASS |
|
|
Home is complete, landscaped, and currently for sale. Site has been cleaned and no loose dirt or sediment on parcel. 3 homes in progress on Saint Patrick in Abode and in compliance. ESC permit conditions satisified.
|
ESC14-00620
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 10:11:10 AM | P | PASS |
|
|
|
ESC14-00488
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 9:24:27 AM | | PASS |
|
|
WIP. Contractors parking on street to prevent trackout. Perimeter wattles installed along front and back. Permit posted.
|
ESC14-00326
| General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 8:59:23 AM | | PASS |
|
|
Poolhouse near completion. Related pool and landscaping project is complete. Yard surrounding the pool & pool house is stabilized/landscaped and no disturbed hillsides. No further ESC inspections.
|
ESC14-00326
| DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 8:57:27 AM | P | PASS |
|
|
|
ESC14-00663
| Site Preparation | 1/7/2015 | 1/8/2015 | 1/7/2015 3:26:00 PM | P | CANC |
|
|
data entry error
|