ELE13-01673
| ELE-Aging Inspection | 1/8/2016 | 1/8/2016 | 1/8/2016 2:14:07 PM | | DONE |
|
|
still under construction
|
ELE16-00054
| Permanent Service | 1/8/2016 | 1/8/2016 | 1/8/2016 1:27:57 PM | P | CANC |
|
|
Lock box is on the fence in the front. Code is 2010 Phone #: ###-#### Inspection requested via web by Jason Wicks see other response
|
ELE16-00029
| Permanent Service | 1/5/2016 | 1/8/2016 | 1/8/2016 1:14:00 PM | P | PASS |
|
|
Contact: Rob Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden p/s o/h rec ok, check all install at final
|
ELE16-00054
| Permanent Service | 1/8/2016 | 1/8/2016 | 1/8/2016 12:09:20 PM | P | FAIL |
|
|
Lock box is on the fence in the front. Code is 2010 Phone #: ###-#### Inspection requested via web by Jason Wicks called contractor, told to provide work space in front of panel, do panel schedule, strap riser, provide 4-wire for range and dryer, remove extension cord from attic in garage
|
ELE16-00010
| Rough-In Permanent Service | 1/7/2016 | 1/8/2016 | 1/8/2016 11:00:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn ri ok, p/s u/g n ok
|
ELE15-03824
| Electrical Rough-In | 1/7/2016 | 1/8/2016 | 1/8/2016 10:10:00 AM | A | PASS |
|
|
This for warm floors in master bathroom and bath #1. Any ? Call Bill ###-#### Phone #: ###-#### Inspection requested via web by Bob Glenn ok cover floor heat only
|
ELE16-00038
| Conference | 1/6/2016 | 1/8/2016 | 1/8/2016 9:47:26 AM | A | DONE |
|
|
Peter Phone #: ###-#### talked about upstairs remodel, calling for inspections
|
ELE14-01066
| Final | 1/7/2016 | 1/8/2016 | 1/8/2016 9:18:02 AM | A | PASS |
|
|
Final Inspection for Building H. Contact Craig Timmons Phone #: ###-#### Inspection requested via web by Cathy Duchek ok final, signed card
|
ELE15-03726
| Final | 1/7/2016 | 1/8/2016 | 1/8/2016 8:19:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn ok final
|