BLD17-04385
| BLD-Final | 1/5/2018 | 1/8/2018 | 1/9/2018 8:51:11 AM | P | PASS |
|
|
Spence Phone #: ###-####
|
BLD17-02995
| BLD-Ceiling Grid Inspection | 1/4/2018 | 1/8/2018 | 1/9/2018 8:32:01 AM | A | PASS |
|
|
Jeff Phone #: ###-####
|
BLD17-02214
| BLD-Energy code compliance | 1/8/2018 | 1/8/2018 | 1/8/2018 3:36:30 PM | P | PASS |
|
|
Manny Phone #: ###-####
|
BLD17-00583
| BLD-Ceiling Grid Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 3:36:29 PM | P | PASS |
|
|
Inspect drop ceilings in east wing on second floor. This is the same one i called and cancelled for this morning. Mid afternoon would be great. Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
|
BLD16-03292
| BLD-Framing/Rough-in | 1/5/2018 | 1/8/2018 | 1/8/2018 3:36:29 PM | P | PEND |
|
|
Robert Phone #: ###-####
|
BLD16-03304
| BLD-Framing/Rough-in | 1/5/2018 | 1/8/2018 | 1/8/2018 1:12:44 PM | P | NR |
|
|
Steve-please call 30 minutes prior for access Phone #: ###-####
|
MIS17-00201
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 12:09:14 PM | P | PASS |
|
|
|
BLD17-03709
| BLD-Framing/Rough-in | 1/7/2018 | 1/8/2018 | 1/8/2018 12:07:03 PM | A | PART |
|
|
Restroom framing, all backing is done in fire treated lumber. Phone #: ###-#### Inspection requested via web by Mike Beeson ok to insulate and cover all but for around colunms colunms need fire proofing
|
BLD17-02297
| BLD-Final | 1/5/2018 | 1/8/2018 | 1/8/2018 10:18:43 AM | A | PEND |
|
|
Tim Phone #: ###-#### needs energy cert and post 2000 dallor bond for driveway and grough grading
|
BLD17-00583
| BLD-Other | 1/5/2018 | 1/8/2018 | 1/8/2018 10:18:43 AM | A | CANC |
|
|
Drop ceilings on 2nd floor Phone #: ###-#### Inspection requested via web by David Banks
|