Inspections for the day of: Monday, January 8, 2018.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00904 BMP Violation1/8/20181/8/20181/8/2018 4:21:20 PMPFAIL
Numerous violations at Cimarron:

- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird.
- DIs on west side of Bird need maintenance
- gutter and sidewalk on Bird needs sweeping and cleaning
-pick up loose trash in plywood piles and put in the two large site dumpster

Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.
ESC17-00102 BMP Violation1/8/20181/8/20181/8/2018 4:21:12 PMPFAIL
Numerous violations at Cimarron:

- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird.
- DIs on west side of Bird need maintenance
- gutter and sidewalk on Bird needs sweeping and cleaning
-pick up loose trash in plywood piles and put in the two large site dumpster

Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.
ESC16-00724 Aging Inspection1/8/20181/8/20181/8/2018 4:12:50 PM CANC
rescheduled for site final
ESC17-00027 Tracking Control1/8/20181/8/20181/8/2018 3:51:30 PMPFAIL
Maintenance needed on construction entrances. Access through site is extremely muddy.

Trackout getting worse on south side of site to Sorenson.

VM left with Roger (super-intendant). Follow up scheduled for tomorrow morning.
ESC16-01729 General Inspection1/8/20181/8/20181/8/2018 3:30:51 PMPPART
Most of storage complex is complete. Some grading work is occuring in middle of site. Some sandy trackout to Beverly form this area. Will follow up for sweep up inspection 1/11. No MS4 on Beverly.
ESC16-01729 General Inspection1/8/20181/8/20181/8/2018 3:27:55 PMPCANC
ESC16-00970 Aging Inspection1/8/20181/8/20181/8/2018 2:43:16 PM PASS
ESC16-00556 General Inspection1/8/20181/8/20181/8/2018 2:08:55 PMPPASS
Subdivision phase complete. No recent activity. CBH has pulled two SFH permits on Chinook but no excavation or activity started. DIs in sub have inlet protection already installed. CBH will need to provide designated concrete washout.
ESC17-01132 General Inspection1/8/20181/8/20181/8/2018 12:45:03 PMPPASS
Working on foundation footprint and site work. Site has perimeter sediment control wattle installed and receiving MS4 DIs have witches hat filters installed. No trackout to Jefferson. Approved.
ESC15-01521 Site Final1/8/20181/8/20181/8/2018 12:36:33 PMPPASS
Work complete. No dirt or other material leaving site. Site prepped for SFH construction, asphalt driveway has already been installed. Demo permit and bond finaled.
ESC16-01706 Random Inspection1/8/20181/8/20181/8/2018 11:43:11 AMPPASS
WIP on site work and tiling the irrigation ditch on site along Irving. No activity or crew onsite at time of inspection. Currently wet & muddy conditions on site as snow melts. NO trackout from site. No corrections requested.
ESC17-01329 Random Inspection1/8/20181/8/20181/8/2018 11:41:58 AMAPASS
WIP on frame for new building. Existing asphalt access to work area has been preserved. No violations observed.
ESC15-01521 Aging Inspection1/8/20181/8/20181/8/2018 11:41:11 AM CANC
ESC17-01367 Site Final1/8/20181/8/20181/8/2018 10:37:25 AMPPASS
SAMG Clinic sign complete. Area at base is landscaped/stabilized. ESC permit conditions satisfied.
ESC16-00676 General Inspection1/8/20181/8/20181/8/2018 10:36:40 AMPPASS
WIP on interior. Staging area is clean. Receiving storm drains still have inlet protection that will need to be removed upon completion of project.

No trackout or discharges from site, no corrections requested.
ESC16-01580 General Inspection1/8/20181/8/20181/8/2018 10:34:29 AM PASS
Project complete, BLD finaled and the clinic is occupied. Site currently covered under snow. Will follow up in February to make sure no materials from project have been left on adjacent lots.

All storm drains within Emerald Station next to SAMG Clinic and Cascadia still have temporary sediment protection installed.
ESC16-01607 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:19:03 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01606 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:55 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01605 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:47 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01602 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:38 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01601 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:29 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01600 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:21 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01599 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:18:13 AMPPASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01604 General Inspection1/8/20181/8/20181/8/2018 10:17:34 AM PASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01604 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:17:25 AMPPASS
ESC16-01603 General Inspection1/8/20181/8/20181/8/2018 10:17:14 AM PASS
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
ESC16-01189 General Inspection1/5/20181/8/20181/8/2018 10:15:44 AMAPASS
No trackout or discharges leaving site.

All vertical construction of units in Marina Apartments are complete. Units along Emerald are finished and some occpied with paved access, stormwater retention, parking. Sod landscaping has been completed along the south side of site. WIP on interior and site work along Preece to the north.

Corrections/tasks remaining to final ESC permit for site:
- remove silt fence along Emerald, complete landscaping and sweep gutter and site access curbing.
- remove stockpile on south side of site, finish paving and sweep apron. As conditions warm this week the frozen dirt on apron should be swept
- check perimeter for any loose construction trash, put in dumpster, remove dumpster
- sweep Preece, remove DI bag from MS4 storm drain.

- Call for site final. All individual unit ESC permits for project have been closed, all remaining ESC inspections will be on this main site permit.
ESC16-01603 DOC - Permit Finaled1/8/20181/8/20181/8/2018 10:15:30 AMPPASS