ESC17-00904
| BMP Violation | 1/8/2018 | 1/8/2018 | 1/8/2018 4:21:20 PM | P | FAIL |
|
|
Numerous violations at Cimarron:
- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird. - DIs on west side of Bird need maintenance - gutter and sidewalk on Bird needs sweeping and cleaning -pick up loose trash in plywood piles and put in the two large site dumpster
Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.
|
ESC17-00102
| BMP Violation | 1/8/2018 | 1/8/2018 | 1/8/2018 4:21:12 PM | P | FAIL |
|
|
Numerous violations at Cimarron:
- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird. - DIs on west side of Bird need maintenance - gutter and sidewalk on Bird needs sweeping and cleaning -pick up loose trash in plywood piles and put in the two large site dumpster
Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.
|
ESC16-00724
| Aging Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 4:12:50 PM | | CANC |
|
|
rescheduled for site final
|
ESC17-00027
| Tracking Control | 1/8/2018 | 1/8/2018 | 1/8/2018 3:51:30 PM | P | FAIL |
|
|
Maintenance needed on construction entrances. Access through site is extremely muddy.
Trackout getting worse on south side of site to Sorenson.
VM left with Roger (super-intendant). Follow up scheduled for tomorrow morning.
|
ESC16-01729
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 3:30:51 PM | P | PART |
|
|
Most of storage complex is complete. Some grading work is occuring in middle of site. Some sandy trackout to Beverly form this area. Will follow up for sweep up inspection 1/11. No MS4 on Beverly.
|
ESC16-01729
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 3:27:55 PM | P | CANC |
|
|
|
ESC16-00970
| Aging Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 2:43:16 PM | | PASS |
|
|
|
ESC16-00556
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 2:08:55 PM | P | PASS |
|
|
Subdivision phase complete. No recent activity. CBH has pulled two SFH permits on Chinook but no excavation or activity started. DIs in sub have inlet protection already installed. CBH will need to provide designated concrete washout.
|
ESC17-01132
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 12:45:03 PM | P | PASS |
|
|
Working on foundation footprint and site work. Site has perimeter sediment control wattle installed and receiving MS4 DIs have witches hat filters installed. No trackout to Jefferson. Approved.
|
ESC15-01521
| Site Final | 1/8/2018 | 1/8/2018 | 1/8/2018 12:36:33 PM | P | PASS |
|
|
Work complete. No dirt or other material leaving site. Site prepped for SFH construction, asphalt driveway has already been installed. Demo permit and bond finaled.
|
ESC16-01706
| Random Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 11:43:11 AM | P | PASS |
|
|
WIP on site work and tiling the irrigation ditch on site along Irving. No activity or crew onsite at time of inspection. Currently wet & muddy conditions on site as snow melts. NO trackout from site. No corrections requested.
|
ESC17-01329
| Random Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 11:41:58 AM | A | PASS |
|
|
WIP on frame for new building. Existing asphalt access to work area has been preserved. No violations observed.
|
ESC15-01521
| Aging Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 11:41:11 AM | | CANC |
|
|
|
ESC17-01367
| Site Final | 1/8/2018 | 1/8/2018 | 1/8/2018 10:37:25 AM | P | PASS |
|
|
SAMG Clinic sign complete. Area at base is landscaped/stabilized. ESC permit conditions satisfied.
|
ESC16-00676
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 10:36:40 AM | P | PASS |
|
|
WIP on interior. Staging area is clean. Receiving storm drains still have inlet protection that will need to be removed upon completion of project.
No trackout or discharges from site, no corrections requested.
|
ESC16-01580
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 10:34:29 AM | | PASS |
|
|
Project complete, BLD finaled and the clinic is occupied. Site currently covered under snow. Will follow up in February to make sure no materials from project have been left on adjacent lots.
All storm drains within Emerald Station next to SAMG Clinic and Cascadia still have temporary sediment protection installed.
|
ESC16-01607
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:19:03 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01606
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:55 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01605
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:47 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01602
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:38 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01601
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:29 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01600
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:21 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01599
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:18:13 AM | P | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01604
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 10:17:34 AM | | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01604
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:17:25 AM | P | PASS |
|
|
|
ESC16-01603
| General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 10:17:14 AM | | PASS |
|
|
Townhome complete. Some work remaining to close main site permit ESC16-01189. All remaining ESC inspections for Marina apartments will be on ESC16-01189. ESC permit finaled.
|
ESC16-01189
| General Inspection | 1/5/2018 | 1/8/2018 | 1/8/2018 10:15:44 AM | A | PASS |
|
|
No trackout or discharges leaving site.
All vertical construction of units in Marina Apartments are complete. Units along Emerald are finished and some occpied with paved access, stormwater retention, parking. Sod landscaping has been completed along the south side of site. WIP on interior and site work along Preece to the north.
Corrections/tasks remaining to final ESC permit for site: - remove silt fence along Emerald, complete landscaping and sweep gutter and site access curbing. - remove stockpile on south side of site, finish paving and sweep apron. As conditions warm this week the frozen dirt on apron should be swept - check perimeter for any loose construction trash, put in dumpster, remove dumpster - sweep Preece, remove DI bag from MS4 storm drain.
- Call for site final. All individual unit ESC permits for project have been closed, all remaining ESC inspections will be on this main site permit.
|
ESC16-01603
| DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 10:15:30 AM | P | PASS |
|
|
|