ELE20-00087
| Electrical Rough-In | 1/8/2020 | 1/8/2020 | 1/8/2020 3:01:49 PM | P | PASS |
|
|
Rough in cover of walls. Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover walls and grd work for 2 floor box location.
|
ELE19-04815
| Final | 1/8/2020 | 1/8/2020 | 1/8/2020 2:03:31 PM | P | PASS |
|
|
Call office or Albert (###-####) if there are any questions. Phone #: ###-#### Inspection requested via web by Bryan Atkins Ok final
|
ELE19-04903
| Electrical Rough-In | 1/7/2020 | 1/8/2020 | 1/8/2020 1:46:31 PM | P | PASS |
|
|
Please contact Bryce (Foreman) @ ###-#### or Barry (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Ok cover. Items UL listed
|
ELE20-00063
| Final | 1/7/2020 | 1/8/2020 | 1/8/2020 1:03:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Hilke Ok final. Tankless has GFI protection, 15a max circuit to new furnace.
|
ELE19-04001
| Final | 1/8/2020 | 1/8/2020 | 1/8/2020 12:34:51 PM | P | PASS |
|
|
Please give me a call a half an hour before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok final mstr bath.
|
ELE19-03060
| Final | 1/8/2020 | 1/8/2020 | 1/8/2020 12:34:29 PM | P | PASS |
|
|
Contact: Jason Konrad Phone #: ###-#### Inspection requested via web by Deb Gooden Ok final. Tested pool cover and lights when I did grd work inspection for front gates and pool. Panel was also labeled.
|
ELE19-00664
| Electrical Rough-In | 1/8/2020 | 1/8/2020 | 1/8/2020 12:06:59 PM | P | PASS |
|
|
Floor heat Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover floor heat mstr
|
ELE20-00079
| Electrical Rough-In | 1/7/2020 | 1/8/2020 | 1/8/2020 10:22:52 AM | A | PASS |
|
|
Inspection requested via web by shane miller Ok cover up bath. New sub panel in basement
|
ELE20-00066
| Final | 1/7/2020 | 1/8/2020 | 1/8/2020 10:18:04 AM | A | PASS |
|
|
Inspection requested via web by Dan Hobdey Ok final. GFI functions properly
|
ELE19-04395
| Final | 1/7/2020 | 1/8/2020 | 1/8/2020 10:17:32 AM | A | PASS |
|
|
Inspection requested via web by Dan Hobdey Ok final. Corrections made.
|
ELE19-04739
| Final | 1/6/2020 | 1/8/2020 | 1/8/2020 9:28:38 AM | A | PASS |
|
|
Approved Plans on site in solar disconnect. All work was performed to approved plans, no deviation necessary. If you have any questions please call Josh at 208.731.0577 Phone #: ###-#### Inspection requested via web by Bryan Lawley Ok final. Line side connection
|
ELE19-00947
| Electrical Rough-In | 1/7/2020 | 1/8/2020 | 1/8/2020 8:55:13 AM | A | PASS |
|
|
Andy Phone #: ###-#### Ok cover 1st floor ceiling flex room, and 2nd floor ceilings hall and 2 bathrooms
|
ELE20-00063
| Final | 1/6/2020 | 1/8/2020 | 1/7/2020 9:37:20 PM | A | CANC |
|
|
Two dedicated 15A 120V circuits from main panel outside to new furnace and tankless water heater located in basement. Call Wyatt for details. Thanks. Phone #: ###-#### >> Inspection requested via web by Dan Hilke Inspection cancelled from web by: Dan Hilke
|