BLD19-03229
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 5:07:09 PM | P | FAIL |
|
|
Call Framer Yurguen Robelero ###-#### when you are on your way so he can meet you. Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
|
BLD19-03253
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 5:06:49 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
|
BLD19-03247
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 3:32:00 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
|
BLD19-03248
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 3:31:39 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
|
BLD19-03249
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 2:50:14 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk/CN issued//not quite ready//
|
BLD19-03250
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 2:49:43 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN issued//not quite ready//
|
BLD19-03251
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 2:49:17 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN issued//not quite ready//
|
BLD19-03252
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 2:48:52 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN issued//not quite ready//
|
BLD19-04625
| BLD-Framing/Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 2:09:05 PM | P | PART |
|
|
John Phone #: ###-####//Soth wall demising ok to cover// ele approved//see plans for signature of approved area//
|
BLD19-00534
| BLD-Conference | 1/7/2020 | 1/8/2020 | 1/8/2020 12:02:39 PM | P | DONE |
|
|
Discuss 2hr walls Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD19-00534
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 12:02:22 PM | P | NR |
|
|
Shear inspection for hardware for exterior cover Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD19-00533
| BLD-Concrete | 1/7/2020 | 1/8/2020 | 1/8/2020 12:01:54 PM | A | PASS |
|
|
Please inspect after 11am, we will be finished with set up and might have to cover the slab. Thanks Phone #: ###-#### Inspection requested via web by Matt Perry//ok pending specials and elevated bar for clearances//
|
BLD19-01150
| BLD-Framing/Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 10:46:36 AM | A | PASS |
|
|
jOHN Phone #: ###-####//corrections made//ok to insulate//
|
BLD12-00075
| BLD-Conference | 1/8/2020 | 1/8/2020 | 1/8/2020 10:46:01 AM | P | DONE |
|
|
previous inspection on 12/30/2019 was on wrong permit number and inspection is invalid//inspection was intended for permit numberBLD19-03422//
|
BLD19-03388
| BLD-Energy code compliance | 1/7/2020 | 1/8/2020 | 1/8/2020 10:06:41 AM | A | PASS |
|
|
TIM Phone #: ###-####
|
BLD19-03422
| BLD-Footing | 1/8/2020 | 1/8/2020 | 1/8/2020 10:04:58 AM | P | PART |
|
|
I (John Cloninger) will be out of town. Rusmir Civic will be the onsite contact - his number is listed above. The 10 am pour will include the east wall and the north wall. If weather permits the slab on grade for the tank bases will also be poured. If there is any trouble my number is ###-####. Phone #: ###-#### Inspection requested via web by John Cloninger//prior footing inspection ok pending specials on 12/30/2019//today wall and slab ok pending specials on rebar, forms, and concrete specials//
|
BLD12-00075
| BLD-Foundation | 1/7/2020 | 1/8/2020 | 1/8/2020 10:03:27 AM | A | CANC |
|
|
I (John Cloninger) will be out of town. Rusmir Civic will be the onsite contact - his number is listed above. The 10 am pour will include the east wall and the north wall. If weather permits the slab on grade for the tank bases will also be poured. If there is any trouble my number is ###-####. Phone #: ###-#### Inspection requested via web by John Cloninger//this is the wrong permit number and previous footing inspection under this permit number is not correct//
|
BLD19-04296
| BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 9:10:17 AM | A | PART |
|
|
shear // Willy Phone #: ###-####//exterior nailing ok//need to add hold down near front entry where hold down is missed//add nuts and straps at portal frames//check at framing//
|
BLD18-03112
| BLD-Aging Inspection | 1/8/2020 | 1/8/2020 | 1/8/2020 8:21:03 AM | | DONE |
|
|
Expires: 02/23/20
|
BLD19-03657
| BLD-Other | 1/7/2020 | 1/8/2020 | 1/8/2020 8:20:22 AM | A | PASS |
|
|
Soffit fire barrier Phone #: ###-#### Inspection requested via web by Kelly Stover//ok per plans//
|
BLD19-03157
| BLD-Final | 1/7/2020 | 1/8/2020 | 1/8/2020 12:00:00 AM | P | CANC |
|
|
Santiago Phone #: ###-#### //
|