PLM95-01741
| INSP - Final | 1/9/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | A | PASS |
|
|
|
PLM95-01789
| INSP - Sewer line | 1/8/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | A | PASS |
|
|
01/09/96 352 - SEWER
|
PLM95-01859
| INSP - Final | 1/8/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | A | CANC |
|
|
ready tues am
|
PLM96-00036
| INSP - Plumbing Rough-in | 1/8/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | A | PART |
|
|
01/09/96 352 - SINK AND ATER HEATER FLOOR DRAIN $1,000.00 2ND FLOOR SUITE 200 water tested on west end drains stubbed into ceiling area requires test hookup east end no tests on water or drains stubbed into down stairs cei space will require test upon hoo
|
PLM96-00038
| INSP - Sewer and Water lines | 1/8/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | A | PASS |
|
|
01/09/96 352 -
|
PLM96-00042
| INSP - Plumbing Rough-in | 1/9/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | P | PASS |
|
|
01/09/96 352 - 1 W/C 1 BASIN 1 SHOWER 1 W/H LAUNDRY TRAY
|
PLM96-00011
| INSP - Plumbing Rough-in | 1/9/1996 | 1/9/1996 | 1/9/1996 12:00:00 AM | P | PASS |
|
|
01/09/96 352 - 1 W/C 1 LAV 1 TUB 1 SINK 1 W/B 1 W/H
|