MEC96-03993
| INSP - Framing/ Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | PART |
|
|
/ / 340 - C/N OK, NEED TO COMPLETE DUCTS
|
BLD96-00464
| INSP - Framing/Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - SENT TO 338 IN ERROR; C/N, NEED 2 HR WALL DETAIL, FIRESTOPPI
|
BLD96-00486
| INSP - Final | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - BLDG 25, LC ONLY
|
BLD96-00543
| INSP - Final | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - BLDG 25, LC ONLY
|
BLD96-01205
| INSP - Framing/Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - C/N, NEED RESUBMITTAL AT AREA SEP. WALL EAST SIDE D WING, CO FIRESTOP ALL WALL & LID PENETRATIONS
|
BLD96-03029
| INSP - Carpentry | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - MET FRAMER, TOLD TO CHK PLAN FOR ENG'G REQ'S AT TALL WALLS
|
BLD96-03030
| INSP - Carpentry | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | | NR |
|
|
/ / 340 - CHK FOR BRACING, NOT COMPLETE
|
BLD96-03297
| INSP - Footings | 1/8/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | A | PASS |
|
|
01/09/97 340 - BURN REBUILD, POURED LOOKS OK
|
BLD96-02463
| INSP - Final | 1/8/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | A | NR |
|
|
01/09/97 340 - NEED FRAME INSP, NR
|
BLD96-02609
| INSP - Framing/Rough-in | 1/8/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | P | CANC |
|
|
01/09/97 340 -
|
BLD96-02161
| INSP - Conference | 1/8/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | P | CANC |
|
|
01/09/97 340 - CONF. ON PRE-FRAME
|
BLD96-02342
| INSP - Final | 1/9/1997 | 1/9/1997 | 1/9/1997 12:00:00 AM | P | FAIL |
|
|
01/09/97 340 - NR, NEED FIRE OK, KEEP C/N
|