Inspections for the day of: Friday, January 9, 1998.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-03409 INSP - Final1/9/19981/9/19981/9/1998 12:00:00 AM PASS
/ / 337 - FNL -OK FINAL sign perm occ card
MEC97-03409 INSP - Final1/8/19981/9/19981/9/1998 12:00:00 AMAFAIL
01/09/98 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC97-03409 INSP - Final1/8/19981/9/19981/9/1998 12:00:00 AMAFAIL
01/09/98 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC97-01651 INSP - Final1/9/19981/9/19981/9/1998 12:00:00 AMPCANC
Jack
MEC97-01651 INSP - Final1/9/19981/9/19981/9/1998 12:00:00 AMPCANC
Jack
MEC97-03568 INSP - Final1/9/19981/9/19981/9/1998 12:00:00 AMPFAIL
01/09/98 337 - Call job super., Rocky @ ###-#### so he can do whatever i job. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC97-03568 INSP - Final1/9/19981/9/19981/9/1998 12:00:00 AMPFAIL
01/09/98 337 - Call job super., Rocky @ ###-#### so he can do whatever i job. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC97-03857 INSP - Framing/ Rough-in1/8/19981/9/19981/9/1998 12:00:00 AMPNR
01/09/98 337 - not ready
MEC98-00007 INSP - Framing/ Rough-in1/9/19981/9/19981/9/1998 12:00:00 AMPFAIL
01/09/98 337 - conference ###-#### Scott need to complete corrections
MEC98-00049 INSP - Retro Fit (check note)1/9/19981/9/19981/9/1998 12:00:00 AMPFAIL
01/09/98 337 - furnace and a water heater CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC98-00084 INSP - Gas pressure test1/9/19981/9/19981/9/1998 12:00:00 AMPPASS
01/09/98 337 - call Ken with Freedom ###-#### GP -OK GAS PIPING