BLD97-02984
| INSP - Framing/Rough-in | 1/8/1998 | 1/9/1998 | 1/12/1998 12:00:00 AM | A | PART |
|
|
01/09/98 407 - engineering hold downs. still need to complete.
|
BLD97-03168
| INSP - Final | 1/8/1998 | 1/9/1998 | 1/12/1998 12:00:00 AM | A | PART |
|
|
01/09/98 407 - left corrections.
|
BLD97-03735
| INSP - Footings | 1/8/1998 | 1/9/1998 | 1/12/1998 12:00:00 AM | A | PART |
|
|
01/09/98 407 - set backs ok,footings & walls poured before inspection.no
|
MEC97-03477
| INSP - Rough-in & Gas Pressure | 1/9/1998 | 1/9/1998 | 1/9/1998 12:00:00 AM | P | FAIL |
|
|
01/09/98 407 - left corrections. gas test passed.
|
MEC98-00080
| INSP - Rough-in & Gas Pressure | 1/9/1998 | 1/9/1998 | 1/9/1998 12:00:00 AM | P | |
|
|
|
BLD97-02866
| INSP - Final | 1/9/1998 | 1/9/1998 | 1/9/1998 12:00:00 AM | P | |
|
|
|
BLD97-03703
| INSP - Footings | 1/8/1998 | 1/9/1998 | 1/9/1998 12:00:00 AM | P | PASS |
|
|
01/09/98 407 - exterior footings ok no interior foots at this time
|
BLD97-03733
| INSP - Footings | 1/9/1998 | 1/9/1998 | 1/9/1998 12:00:00 AM | P | |
|
|
###-#### Randy
|