Inspections for the day of: Tuesday, January 9, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03719 BLD-Foundation1/8/20011/9/20011/9/2001 12:00:00 AMAPASS
DAve Cox ###-####
BLD00-03143 BLD-Framing/Rough-in1/8/20011/9/20011/9/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/08/2001 at 13:42:41. Contact: ###-####. head height ok. work in progess. 1/9/2001 1:27:37 PM
BLD99-01732 BLD-Final1/9/20011/9/20011/9/2001 12:00:00 AMAPASS
Added by Inspector: 301 On 1/9/2001 9:31:17 AM final ok for c/o
BLD99-02803 BLD-Energy code compliance1/9/20011/9/20011/9/2001 12:00:00 AMAPASS
Added by Inspector: 301 On 1/9/2001 9:31:56 AM
BLD00-03605 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPFAIL
bob ###-#### shear insp. need to block brace panels less than 48 inches wide and nail per aproved plan. 1/9/2001 1:58:58 PM
BLD00-03605 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPFAIL
bob ###-#### shear insp. need to block brace panels less than 48 inches wide and nail per aproved plan. 1/9/2001 1:58:58 PM
BLD00-01563 BLD-Concrete1/8/20011/9/20011/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:53. Contact: ###-####. placed with special insp. pending report. 1/9/2001 1:28:20 PM
BLD00-02754 BLD-Framing/Rough-in1/8/20011/9/20011/9/2001 12:00:00 AMPFAIL
fr insp gene- ###-#### c/n to supply change to steel framing from wood for bearing walls/how to maintane tenent walls at 6 inch pipe colums/ leager atchment/ truss engineering / truss hangers void not instaled per manufactures listing. 1/9/2001 5:13:16 PM