PLM00-02745
| Plumbing Rough-in | 1/9/2001 | 1/9/2001 | 1/9/2001 12:00:00 AM | P | PASS |
|
|
Rob ###-####
|
PLM00-04403
| Plumbing Rough-in | 1/9/2001 | 1/9/2001 | 1/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 10:47:09. Contact: ###-####. 3"s.s. branch into basement area test ok 1/9/2001 1:34:28 PM
|
PLM01-00002
| Plumbing Rough-in | 1/9/2001 | 1/9/2001 | 1/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 10:58:41. Contact: ###-####.
|