Inspections for the day of: Tuesday, January 9, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03025 BLD-Framing/Rough-in1/8/20011/9/20011/9/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/08/2001 at 13:13:17. Contact: ###-####.ext walls ok for insulation. 1/9/2001 12:31:52 PM
BLD00-01643 BLD-Final1/8/20011/9/20011/9/2001 12:00:00 AMAFAIL
###-#### need copy of s-i final letter which is at the site, also project engineer needs to address the noted deviations. 1/9/2001 11:04:07 AM 1/9/2001 11:06:08 AM
BLD00-03590 BLD-Other1/8/20011/9/20011/9/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/08/2001 at 14:38:45. Contact: ###-####.need approved plans on site c/n posted. 1/9/2001 11:14:39 AM
BLD00-02865 BLD-Framing/Rough-in1/8/20011/9/20011/9/2001 12:00:00 AMAPASS
Tim ###-####. existing door support. only new work is tube steel framing for new glass store front which is suported by deck as required by plan. 1/9/2001 10:26:12 AM
BLD00-00775 BLD-Final1/9/20011/9/20011/9/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/09/2001 at 08:35:30. Contact: ###-####.
BLD00-02923 BLD-Energy code compliance1/9/20011/9/20011/9/2001 12:00:00 AMPPASS
###-####
BLD00-03023 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/09/2001 at 08:52:31. Contact: ###-####.c/n posted. 1/9/2001 2:33:21 PM
BLD00-02840 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPPASS
rod ###-####
BLD00-03566 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPPASS
fr ###-####- neil 1/9/2001 1:36:32 PMdone at am. 1/9/2001 3:25:40 PM