Inspections for the day of: Tuesday, January 9, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02884 BLD-Foundation1/8/20011/9/20011/9/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/08/2001 at 11:05:52. Contact: ###-####.
retaining wall foundation,all foundation on west side ok w/ verbal corrections 1/9/2001 10:23:43 AM
BLD00-03650 BLD-Framing/Rough-in1/8/20011/9/20011/9/2001 12:00:00 AMAPART
Jeff Uffelman ###-####
conference on the c/n, on framing 1/9/2001 11:55:17 AM
BLD00-03378 BLD-Final1/8/20011/9/20011/9/2001 12:00:00 AMAPASS
###-#### will call a. m to meet
sign off sheet signed off for final 1/9/2001 10:47:01 AM
BLD00-02908 BLD-Final1/8/20011/9/20011/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/08/2001 at 16:13:17. Contact: ###-####.
c of c # 19904 issued w/ conditions of drainage from structure, verify achd, zoning, pw sign offs 1/9/2001 10:06:46 AM
BLD00-03134 BLD-Framing/Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/09/2001 at 09:33:32. Contact: ###-####.
ok to insulate and rock if no electrical, otherwise you fail due to no elec. sign off 1/9/2001 12:58:59 PM
MEC00-04298 Rough-in1/9/20011/9/20011/9/2001 12:00:00 AMPFAIL
r/i jeff- ###-####
c/n posted 1/9/2001 1:13:54 PM
MEC00-04298 Pressure Test1/9/20011/9/20011/9/2001 12:00:00 AMPFAIL
jeff ###-####
c/n posted, 15 psi 1/9/2001 1:14:43 PM
BLD00-03389 BLD-Wall cover1/4/20011/9/20011/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/04/2001 at 13:01:12. Contact: ###-####.
not all the way done 1/9/2001 1:45:14 PM