ELE01-03724
| Final | 1/8/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | A | PASS |
|
|
###-####. completed. 1/9/2002 11:06:39 AM
|
ELE01-03220
| Final | 1/8/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | A | PASS |
|
|
###-####. corrections completed. 1/9/2002 10:07:10 AM
|
ELE01-03965
| Rough-In Permanent Service | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
###-####. eastend. 2nd and 3rd level apt. units (18 total), ele r/i. main service/ meters for 27 apartment units.
p/s ug n capitol ele #3965-ok. 1/9/2002 1:37:02 PM
|
ELE01-04192
| Electrical Rough-In | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PART |
|
|
###-####. ceiling r/i. 1/9/2002 4:30:32 PM
|
ELE01-02083
| Final | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 08:31:20. Contact: ###-####. 110-26 (f)(2). outdoor. roof-top hvac disconnect shall have 3ft clearance in front of fused disconnect. raised roof-hatch in front of switch-gear. 1/9/2002 3:51:38 PM
|
ELE01-04283
| Electrical Rough-In | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PART |
|
|
###-#### 2nd floor inspect. northend r/i. 1/9/2002 5:06:36 PM
|
ELE02-00070
| Rough-In Permanent Service | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PART |
|
|
###-####. ele r/i only. 1/9/2002 11:38:03 AM
|
ELE01-04186
| Electrical Rough-In | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
CONF ONLY DOUG ###-####
|