FIR98-00256
| INSP-Final Inspection | 1/8/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 1/8/2002 11:34:51 AM all items on correction lists from 12/98 were verified and completed 1/9/2002 10:17:14 AM
|
BLD01-02246
| FIRE-Final Inspection | 1/8/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | A | FAIL |
|
|
###-#### need current inspection tag on fire sprinkler riser; flow switch not working according to report by simplex-grinnell; called Don (GC) about this and he will find out what is going on. 1/9/2002 10:19:16 AM
|
BLD00-00153
| FIRE-Final Inspection | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00381
| FIRE-Final Inspection | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
|
BLD01-03109
| FIRE-Sprinkler Rough-in | 1/9/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01825
| FIRE-Final Inspection | 1/8/2002 | 1/9/2002 | 1/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 09:24:03. Contact: .
|