Inspections for the day of: Thursday, January 9, 2003.
Number of inspections: 10
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00220 BLD-Conference1/2/20041/5/2003 P 
call 1st before eva ###-####
MEC03-00036 Conference1/9/20031/9/20031/9/2003 12:00:00 AMADONE
BLD02-02432 BLD-Other1/8/20031/9/20031/9/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/08/2003 at 13:23:09. Contact: ###-####. ceiling grid new area 1/9/2003 11:19:34 AM
BLD02-00653 BLD-Final1/8/20031/9/20031/9/2003 12:00:00 AMAFAIL
###-#### c/n on site 1/9/2003 11:22:28 AM
MEC02-03070 Final1/8/20031/9/20031/9/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/08/2003 at 17:11:12. Contact: ###-####. needs gaurd post in front of furnace 1/9/2003 9:39:24 AM
MEC03-00015 Rough-in1/9/20031/9/20031/9/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/09/2003 at 08:04:42. Contact: .
MEC03-00015 Pressure Test1/9/20031/9/20031/9/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/09/2003 at 08:05:21. Contact: .
BLD02-01991 BLD-Framing/Rough-in1/9/20031/9/20031/9/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/09/2003 at 08:14:25. Contact: . c/n on site ok to insulate 1/9/2003 2:04:53 PM
BLD02-02521 BLD-Footing1/9/20031/9/20031/9/2003 12:00:00 AMPPASS
mike; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-00653 BLD-Final1/9/20031/9/20031/9/2003 12:00:00 AMPPASS
c .c . # 22621 issued 1/9/2003 2:52:46 PM