FIR05-00803
| INSP-Alarm Testing | 1/6/2006 | 1/9/2006 | 1/10/2006 8:40:33 AM | P | FAIL |
|
|
Duplicate inspection request for the fire sprinkler permit, field installation does not reflect the approved plan to a significant degree which shall require resubmittal for verification and approval of the modifications prior to final field inspection.
|
FIR05-00803
| INSP-Final Inspection | 1/6/2006 | 1/9/2006 | 1/10/2006 8:29:33 AM | P | FAIL |
|
|
The fire sprinkler field installation does not reflect the approved plan to a significant degree which shall require resubmittal for verification and approval of the modifications prior to final field inspection.
|
BLD05-02317
| FIRE-Final Inspection | 1/9/2006 | 1/9/2006 | 1/10/2006 8:18:39 AM | P | DEFR |
|
|
wip
|
FIR05-00849
| INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/10/2006 8:17:05 AM | P | PASS |
|
|
Items on c/n have been completed and retested, fire alarm passed final inspection.
|
FIR05-00802
| INSP-Final Inspection | 1/6/2006 | 1/9/2006 | 1/10/2006 8:11:36 AM | P | FAIL |
|
|
One strobe notification device failed to function properly during testing, the two fan coil unit duct smoke detectors tested okay.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 1/6/2006 | 1/9/2006 | 1/10/2006 8:01:32 AM | A | PART |
|
|
Overhead hydrostatic test for the dry systems on levels 2, 3 and 4 passed inspection.
|
BLD04-00947
| FIRE-Sprinkler Rough-in | 1/6/2006 | 1/9/2006 | 1/9/2006 11:08:45 AM | A | PART |
|
|
Inspection for tenting at fire sprinklers good for cover at 3rd floor apt. A east only, the remaining 3 units on the floor not complete at this time.
|
BLD04-02056
| FIRE-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 10:18:02 AM | P | FAIL |
|
|
Need to provide a fire extinguisher for the second level in the common stairway, remove dust covers from smoke alarms, remove tape and paper at the fire sprinkler heads and a/v in the common stairway.
|
FIR05-00442
| INSP-Final Inspection | 1/6/2006 | 1/9/2006 | 1/9/2006 10:14:19 AM | A | PASS |
|
|
Fire sprinkler passed final inspection, will verify tape and paper at heads in the common stairway have been removed at BLD final.
|