FIR05-00859
| INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 2:40:53 PM | P | CANC |
|
|
Rough In and Final; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
FIR05-00821
| INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 1:17:50 PM | P | FAIL |
|
|
Need ceiling tile installed and one pendant head in the stock room is overspaced.
|
FIR04-00684
| INSP-Sprinkler Rough-in/Hydro | 1/6/2006 | 1/9/2006 | 1/9/2006 12:36:13 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/6/2006 at 2:06:03 PM. Contact: ###-####.
|
FIR05-00104
| INSP-Alarm Testing | 1/9/2006 | 1/9/2006 | 1/9/2006 12:31:55 PM | P | CANC |
|
|
Contractor has not lowered the manual pull stations that are mounted too high. No test performed.
|
BLD05-01515
| FIRE-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 11:53:32 AM | P | PASS |
|
|
Life safety finaled
|
FIR05-00638
| INSP-Final Inspection | 1/6/2006 | 1/9/2006 | 1/9/2006 11:41:16 AM | A | PASS |
|
|
Permit finaled
|
BLD04-02937
| FIRE-Final Inspection | 1/6/2006 | 1/9/2006 | 1/9/2006 11:36:26 AM | A | PART |
|
|
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
|
FIR05-00487
| INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 11:36:10 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
|
FIR05-00571
| INSP-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 11:35:52 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanneman's permission for the church to occupy the new addition so that work can be completed in the existing area.
|
FIR05-00389
| INSP-Final Inspection | 1/5/2006 | 1/9/2006 | 1/9/2006 9:04:27 AM | A | PASS |
|
|
Permit finaled
|