FIR05-00708
| INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 3:17:31 PM | A | PASS |
|
|
Corrections are complete, final fire sprinkler inspection passed, permit finaled.
|
FIR05-00707
| INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 3:15:32 PM | A | PASS |
|
|
C/N items have been verified for completion, final sprinkler inspection passed.
|
FIR05-00710
| INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 3:14:36 PM | A | PASS |
|
|
Items on previous c/n are finished, fire sprinkler permit finaled.
|
FIR05-00709
| INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 3:13:44 PM | A | PASS |
|
|
The required corrections have been completed, final inspection passed, permit finaled.
|
BLD05-00807
| FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 3:12:44 PM | A | FAIL |
|
|
Locate smoke alarms per NFPA 72 2002.
|
BLD05-00806
| FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 3:11:58 PM | A | FAIL |
|
|
Smoke alarms must be located per NFPA 72.
|
BLD05-00805
| FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 3:11:05 PM | A | FAIL |
|
|
Relocate smoke alarms per NFPA 72.
|
BLD05-00804
| FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 3:10:26 PM | A | FAIL |
|
|
Relocate smoke alarms per NFPA 72 2002.
|
FIR06-00334
| FIR-Aging Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 1:12:32 PM | | DONE |
|
|
In progress
|
BLD06-03512
| FIRE-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 1:08:09 PM | P | FAIL |
|
|
Need to provide exit signs/emergency lights at two locations as indicated on approved plan set sheet A2.1, also need to provide one 2A10BC extinguisher per floor level with current certification tag, remove the tape covering the SW sprinkler head at the skylight in the basement.
|
BLD06-02994
| FIRE-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 12:40:47 PM | A | PART |
|
|
Fire life safety for the south half of the remodel area is acceptable.
|
FIR06-00890
| INSP-Final Inspection | 1/8/2007 | 1/9/2007 | 1/9/2007 12:38:50 PM | A | PART |
|
|
The south half of the permitted work scope area is completed and approved, final pending completion of the north half or "phase two" of the project.
|