Inspections for the day of: Tuesday, January 9, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00708 INSP-Final Inspection1/9/20071/9/20071/9/2007 3:17:31 PMAPASS
Corrections are complete, final fire sprinkler inspection passed, permit finaled.
FIR05-00707 INSP-Final Inspection1/9/20071/9/20071/9/2007 3:15:32 PMAPASS
C/N items have been verified for completion, final sprinkler inspection passed.
FIR05-00710 INSP-Final Inspection1/9/20071/9/20071/9/2007 3:14:36 PMAPASS
Items on previous c/n are finished, fire sprinkler permit finaled.
FIR05-00709 INSP-Final Inspection1/9/20071/9/20071/9/2007 3:13:44 PMAPASS
The required corrections have been completed, final inspection passed, permit finaled.
BLD05-00807 FIRE-Final Inspection1/8/20071/9/20071/9/2007 3:12:44 PMAFAIL
Locate smoke alarms per NFPA 72 2002.
BLD05-00806 FIRE-Final Inspection1/8/20071/9/20071/9/2007 3:11:58 PMAFAIL
Smoke alarms must be located per NFPA 72.
BLD05-00805 FIRE-Final Inspection1/8/20071/9/20071/9/2007 3:11:05 PMAFAIL
Relocate smoke alarms per NFPA 72.
BLD05-00804 FIRE-Final Inspection1/8/20071/9/20071/9/2007 3:10:26 PMAFAIL
Relocate smoke alarms per NFPA 72 2002.
FIR06-00334 FIR-Aging Inspection1/9/20071/9/20071/9/2007 1:12:32 PM DONE
In progress
BLD06-03512 FIRE-Final Inspection1/9/20071/9/20071/9/2007 1:08:09 PMPFAIL
Need to provide exit signs/emergency lights at two locations as indicated on approved plan set sheet A2.1, also need to provide one 2A10BC extinguisher per floor level with current certification tag, remove the tape covering the SW sprinkler head at the skylight in the basement.
BLD06-02994 FIRE-Final Inspection1/8/20071/9/20071/9/2007 12:40:47 PMAPART
Fire life safety for the south half of the remodel area is acceptable.
FIR06-00890 INSP-Final Inspection1/8/20071/9/20071/9/2007 12:38:50 PMAPART
The south half of the permitted work scope area is completed and approved, final pending completion of the north half or "phase two" of the project.