Inspections for the day of: Wednesday, January 9, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM07-03542 Roof Drains1/9/20081/9/20081/9/2008 4:48:09 PMPPART
backgraded 4" roof drain on east side pass. will final permit when revised site plans are received & excepted by lee rice & eric strole.
PLM08-00052 Water Softner Final1/9/20081/9/20081/9/2008 4:00:29 PMPPASS
PLM07-04137 Plumbing Rough-in1/9/20081/9/20081/9/2008 3:48:32 PMPFAIL
dwv & water test failed in both sides.
PLM08-00050 Plumbing Rough-in1/9/20081/9/20081/9/2008 3:47:14 PMPFAIL
bob Phone #: ###-####-pipe island sink per 2003 upc, need c/o on foot vent, need c/o on base of stack, water lines for future bath need to be relocated as not subject to freezeing, need 90 on trap arm for future toilet.
PLM08-00030 Water Heater Final1/9/20081/9/20081/9/2008 1:51:08 PMPPASS
please call Kelea with questions at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
PLM08-00052 Final1/8/20081/9/20081/9/2008 10:20:33 AMAFAIL
please call Barbara Kuchenriter the owner before going out to make sure home. # ###-#### -need shut off valve for water softner.
THANK YOU Phone #: ###-#### Internet Inspection Request from: Jon VanVleet
PLM07-02470 Plumbing Rough-in1/9/20081/9/20081/9/2008 10:19:19 AMAPART
reinspection-all corrections that are not covered with sheetrock are complete, what is covered can be checked on final test, need to retest water & tie in 4" roof drain in building & test & finish wrap on w-3.
PLM07-04137 Plumbing Rough-in1/7/20081/9/20081/9/2008 8:58:16 AMAFAIL
boris Phone #: ###-####-dwv & water test failed (both sides)