PLM08-02733
| Plumbing Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 4:52:52 PM | P | FAIL |
|
|
scott ###-####-dwv test failed both sides, 2nd flr east side revent & overhead vent for kitchen sink has backgrade, p-trap for tub west side 2nd flr needs to be on warm side of house to prevent from freezing, all new 1 & 2 family residences must be preplumbed for soft water, need fullway valve on water supply, 3" san tee west side for 2nd flr toilet in not aligned & has strain.
|
PLM09-00035
| Water Heater Final | 1/8/2009 | 1/9/2009 | 1/9/2009 2:58:12 PM | P | PASS |
|
|
Homeowner is Gene McDonough @ ###-####. They have requested an early afternoon inspection. Phone #: ###-#### Internet Inspection Request from: Jane Amy
|
ESC06-00929
| Aging Inspection | 1/9/2009 | 1/9/2009 | 1/9/2009 1:36:34 PM | | PASS |
|
|
|
ESC06-00929
| Site Final | 1/9/2009 | 1/9/2009 | 1/9/2009 1:36:21 PM | P | PASS |
|
|
|
PLM08-02733
| Plumbing Rough-in | 1/8/2009 | 1/9/2009 | 1/9/2009 11:02:32 AM | A | FAIL |
|
|
scott Phone #: ###-####-dwv test failed, support dwv every 4', y on vent in overhead in backwards.
|
PLM08-02237
| Final | 1/8/2009 | 1/9/2009 | 1/9/2009 10:30:20 AM | A | PASS |
|
|
code is 1290 Phone #: ###-#### Internet Inspection Request from: John Hensley
|
PLM08-02747
| Plumbing Rough-in | 1/7/2009 | 1/9/2009 | 1/9/2009 9:55:56 AM | A | PASS |
|
|
Ready by 10:00AM Phone #: ###-#### Internet Inspection Request from: John Hensley
|
PLM08-02747
| DOC - Permit Finaled | 1/9/2009 | 1/9/2009 | 1/9/2009 9:55:46 AM | P | PASS |
|
|
Ready by 10:00AM Phone #: ###-#### Internet Inspection Request from: John Hensley
|
PLM09-00013
| Plumbing Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 9:22:14 AM | A | FAIL |
|
|
waterlines need to be 12" from can lights & retest water.
|
PLM09-00015
| Final | 1/6/2009 | 1/9/2009 | 1/8/2009 2:24:57 PM | P | CANC |
|
|
please call mile before going out to make sure he is ready at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
|