FIR08-00270
| INSP-Sprinkler Rough-in/Hydro | 1/8/2009 | 1/9/2009 | 1/13/2009 5:22:40 PM | A | PART |
|
|
See inspection comments 1/13.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 1/8/2009 | 1/9/2009 | 1/12/2009 5:07:19 PM | A | PART |
|
|
10th floor rough-in appears acceptable pending verification as-built plans match approved resubmittals for field modifications. 5th floor corridor cover inspection failed due to two overspaced pendent heads and one missed obstruction.
|
FIR08-00801
| INSP-Supply line flush | 1/8/2009 | 1/9/2009 | 1/9/2009 6:32:10 PM | P | PART |
|
|
UG fire supply line hydrostatic test passed. Also okayed UG install for bury.
|
BLD06-01451
| FIRE-Conference | 1/8/2009 | 1/9/2009 | 1/9/2009 6:30:04 PM | A | DONE |
|
|
Regarding pin up insulation at the garage levels adjacent to sprinkler uprights.
|
FIR08-00424
| INSP-Conference | 1/9/2009 | 1/9/2009 | 1/9/2009 6:28:43 PM | P | DONE |
|
|
Regarding project completion schedule.
|
FIR08-00676
| FIR-Aging Inspection | 1/9/2009 | 1/9/2009 | 1/9/2009 12:10:51 PM | | DEFR |
|
|
In progress
|
FIR08-00723
| INSP-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 12:06:35 PM | A | PASS |
|
|
Site testing passed, fire alarm permit finaled.
|
BLD08-01434
| FIRE-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 10:19:11 AM | A | PASS |
|
|
Items on C/N completed, fire life safety passed.
|
FIR08-00739
| INSP-Final Inspection | 1/9/2009 | 1/9/2009 | 1/9/2009 10:18:30 AM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00739
| INSP-Alarm Testing | 1/8/2009 | 1/9/2009 | 1/9/2009 10:17:57 AM | A | PASS |
|
|
Necessary repairs have been made, battery power fire alarm testing passed.
|
BLD08-02129
| FIRE-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 10:13:53 AM | A | PART |
|
|
Final pending completion of work at leasable work space 400 and installation of correct directional arrow exit signs.
|