BLD12-02399
| BLD-Framing/Rough-in | 1/8/2013 | 1/9/2013 | 1/10/2013 12:02:23 PM | A | PEND |
|
|
Jeff ###-#### Waiting for fix from Engineer of record for shear bracing.
|
BLD12-01910
| BLD-Other | 1/9/2013 | 1/9/2013 | 1/9/2013 5:01:11 PM | P | PASS |
|
|
Sheet rock inspection-Pat Phone #: ###-#### 1st layer and metal channel....ok.
|
BLD12-01910
| BLD-Energy code compliance | 1/8/2013 | 1/9/2013 | 1/9/2013 5:00:07 PM | P | PASS |
|
|
Pat phone
|
GCB12-00164
| GCB-Footing | 1/8/2013 | 1/9/2013 | 1/9/2013 4:19:26 PM | P | PASS |
|
|
Ryan @ ###-#### PM Inspection
|
GCB12-00098
| GCB-Final | 1/7/2013 | 1/9/2013 | 1/8/2013 5:15:56 PM | P | PASS |
|
|
Chuck ###-#### Note......MTI inspected and approved reinforcement in CMU wall per the approved plan.
|
BLD12-02798
| BLD-Final | 1/8/2013 | 1/9/2013 | | A | |
|
|
chuck Phone #: ###-####
|