FIR14-00018
| INSP-Sprinkler Rough-in/Hydro | 1/8/2014 | 1/9/2014 | 1/9/2014 3:46:42 PM | A | PASS |
|
|
Underground hydro test passed.
|
FIR14-00018
| INSP-Supply line flush | 1/8/2014 | 1/9/2014 | 1/9/2014 3:23:16 PM | A | PASS |
|
|
Underground flush passed
|
FIR13-00690
| INSP-Sprinkler Rough-in | 1/8/2014 | 1/9/2014 | 1/9/2014 1:51:55 PM | A | PASS |
|
|
See the city approved plans for locations where piping can be covered marked in red.
|
FIR13-00712
| INSP-Sprinkler Rough-in | 1/8/2014 | 1/9/2014 | 1/9/2014 1:50:42 PM | A | PART |
|
|
Piping installation passed but round duct work installed below the ceiling is causing obstructions. Don and I went over the "three times rule" in NFPA 13. He is going to modify the installation.
|
BLD13-03567
| FIRE-Final Inspection | 1/9/2014 | 1/9/2014 | 1/9/2014 1:48:59 PM | P | PASS |
|
|
Life safety passed
|