Inspections for the day of: Friday, January 9, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00364 General Inspection1/9/20151/9/20151/9/2015 12:35:06 PM PASS
ESC14-00629 Tracking Control1/8/20151/9/20151/9/2015 11:20:12 AMAPEND
follow up

Wattles installed as requested and mud cluds scraped off road.

Corrections remaining:
1. Change out the two DI bags in the alley. Full of mud
2. Sweep road when mud dries and conditions improve (currently too wet/frozen to have sweeper)
ESC14-00729 Aging Inspection1/9/20151/9/20151/9/2015 11:10:44 AM PASS
Ball wall is installed near b-ball courts and surrounding area cleaned and stabilized.

ESC permit finaled.
ESC14-00729 DOC - Permit Finaled1/9/20151/9/20151/9/2015 11:10:20 AMPPASS
ESC13-01006 Tracking Control1/9/20151/9/20151/9/2015 11:03:08 AMPFAIL
Trackout on multiple lots at Tripplett Ranch townhomes.

Notified Clint they should have sweeper service after the 3 active homesite have the foundations installed. No trackout to main road (Millet) or stormwater discharge.
ESC14-00670 Random Inspection1/9/20151/9/20151/9/2015 10:57:20 AMPPART
Site perimeter and sidewalks are clean. Yesterday or today a contractor drove across adjacent lot and disturbed vegetation and tracked out some mud.

Called Bruno Built RP Jeremy to notify him of issue and to clean up trackout and prohibit future use of this track and restore as necessary.
ESC14-00526 General Inspection1/9/20151/9/20151/9/2015 10:21:32 AM PASS
WIP at rear of OrePac facility, no trackout to Federal Way. Stormwater runoff is retained onsite. No corrections needed.
ESC14-01147 Site Preparation1/8/20151/9/20151/9/2015 10:00:53 AMAPASS
Bobby Phone #: ###-####

Permit posted. WIP on two other townhomes on adjacent lots and they are in compliance. Approved for excavation.

Requested perimeter wattle to line Valencia.
ESC14-00671 Aging Inspection1/9/20151/9/20151/9/2015 9:51:08 AM PASS
Retaining walls not yet fully complete. Lusk Place in progress - see also ESC14-00212
ESC14-00752 Aging Inspection1/9/20151/9/20151/9/2015 9:40:20 AM PASS
Pool project for ongoing large home remodel/restoration is in progress. No trackout to Boise due to stabilized entrance. Stockpiles stored within walled compound. See all ESC13-00930.
ESC14-00530 General Inspection1/9/20151/9/20151/9/2015 8:45:48 AM PASS
WIP. Contractors staying off unfinished/dirt area and parking in completed parking lot as well as material staging. No dischages. No trackout. Approved.
ESC14-00315 General Inspection1/9/20151/9/20151/9/2015 8:13:19 AM PASS
Grading and drainage for phase 1 of Cordillera is complete. Current vertical construction activity and landscaping is covered and inspected under ESC14-00059. No outstanding ESC issues in relation to this permit; permit finaled.
ESC14-00315 DOC - Permit Finaled1/9/20151/9/20151/9/2015 8:11:13 AMPPASS