ELE13-00238
| ELE-Aging Inspection | 1/9/2017 | 1/9/2017 | 1/11/2017 7:17:30 AM | | DONE |
|
|
Message was left on 6/16/16, no inspection has been requested yet.
|
ELE16-04134
| Electrical Rough-In | 1/5/2017 | 1/9/2017 | 1/9/2017 12:47:18 PM | P | PASS |
|
|
Contact Shane Farwell if there are any issues to address. Thank you Phone #: ###-#### Inspection requested via web by shane farwell Fireplaces up and down are being converted to gas, ok to run power with gas line through existing cleanout. Read manu specs for distance of wiring away from back and sides of new FP.
|
ELE17-00027
| Electrical Rough-In | 1/6/2017 | 1/9/2017 | 1/9/2017 12:45:52 PM | P | PASS |
|
|
Please call Heather at ###-#### half an hour before arrival for access. The owner will trim out of the kitchen at a later time per their request. If you have any questions please call Jeremiah at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell RI ok cover
|
ELE17-00027
| Final | 1/6/2017 | 1/9/2017 | 1/9/2017 12:45:22 PM | P | CANC |
|
|
Please call Heather at ###-#### half an hour before arrival for access. The owner will trim out of the kitchen at a later time per their request. If you have any questions please call Jeremiah at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell. No final, this is RI inspection.
|
ELE17-00028
| Conference | 1/6/2017 | 1/9/2017 | 1/9/2017 9:42:13 AM | A | DONE |
|
|
look at electrical panel location with superintendent Phone #: ###-#### Inspection requested via web by mike brown Discussed new location of new panel where duct work will not be present.
|
ELE16-03459
| Final | 1/8/2017 | 1/9/2017 | 1/9/2017 8:38:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI ok final
|