PLM18-00034
| Water Heater Final | 1/4/2018 | 1/9/2018 | 1/9/2018 4:51:34 PM | P | PASS |
|
|
The number provided is for the tenant. If you could please call her when you are on your way that would be great. Our office number is ###-#### Phone #: ###-#### Inspection requested via web by McKenna Haycock
|
PLM18-00101
| Water and/or Sewer | 1/9/2018 | 1/9/2018 | 1/9/2018 4:32:26 PM | P | PART |
|
|
new swr hook up // Dean Phone #: ###-#### Sewer is required to be tested with water or air.
|
PLM17-05082
| Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 3:55:43 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Paint all exposed ABS pipe and fittings with latex paint. Insatll all cleanouts per ISPC 707.9
|
PLM18-00099
| Water Heater Final | 1/9/2018 | 1/9/2018 | 1/9/2018 3:30:50 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field.. Lacks enouigh combustion air. Will run an air intake from the roof for the new tankless and recall
|
PLM18-00097
| Final | 1/8/2018 | 1/9/2018 | 1/9/2018 2:25:49 PM | P | PASS |
|
|
Call Buck When On Way Phone #: ###-#### Inspection requested via web by Ben Davis
|
PLM17-02530
| Water Heater Final | 1/8/2018 | 1/9/2018 | 1/9/2018 2:09:13 PM | P | PASS |
|
|
Key box code 1379. Please call me if you have any questions, Thank You, AnnMarie ###-####. Phone #: ###-#### Inspection requested via web by AnnMarie McCaw
|
PLM17-05000
| Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 12:22:04 PM | A | PASS |
|
|
Please call chris when on way. ###-#### Phone #: ###-#### Inspection requested via web by Chris Naillon
|
PLM17-05116
| Water and/or Sewer | 1/8/2018 | 1/9/2018 | 1/9/2018 12:06:49 PM | P | PASS |
|
|
Steve Phone #: ###-####
|
PLM17-05116
| DOC - Permit Finaled | 1/9/2018 | 1/9/2018 | 1/9/2018 12:06:28 PM | P | PASS |
|
|
|
PLM17-04715
| Water and/or Sewer | 1/9/2018 | 1/9/2018 | 1/9/2018 11:43:42 AM | P | FAIL |
|
|
Customer back filled trenches after being told not to. Phone #: ###-#### Inspection requested via web by Pat Marvin. Uncover the piping from the well to the house and all branch lines for inspection
|
PLM18-00069
| Water Heater Final | 1/5/2018 | 1/9/2018 | 1/9/2018 10:51:28 AM | A | PASS |
|
|
CALL BEN WINN WHEN YOU ARE ON YOUR WAY. Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM17-03716
| Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 10:38:51 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
PLM18-00072
| Water Heater Final | 1/5/2018 | 1/9/2018 | 1/9/2018 10:23:15 AM | A | PASS |
|
|
Please call me if you have any questions. Thank You, AnnMarie ###-#### Phone #: ###-#### Inspection requested via web by AnnMarie McCaw
|
PLM18-00033
| Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 9:38:58 AM | A | PASS |
|
|
Changed out Backflow to RP and is ready to inspect in mechanical room. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy. The underfloor piping was never pressure tested, however has no joints and is not taking water.
|
PLM17-04316
| Water and/or Sewer | 1/8/2018 | 1/9/2018 | 1/9/2018 9:06:59 AM | A | PART |
|
|
Brett-water line only Phone #: ###-####. ok to cover water
|