FIR17-00305
| INSP-Sprinkler Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 2:54:46 PM | P | PART |
|
|
Piping above the lay-in ceilings is ok to cover. Sprinkler coverage is required under the overhead door. Also the dry sidewall heads on under the east canopy are less than 4" from the underside of the soffit.
|
BLD17-04485
| FIRE-Final Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 12:20:52 PM | P | PASS |
|
|
life safety passed
Sid Phone #: ###-####
|
NAF17-00091
| INSP-Sprinkler Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 10:20:10 AM | A | PASS |
|
|
The underground supply line rough-in passed. Piping can be covered.
|
BLD17-01063
| FIRE-Final Inspection | 1/8/2018 | 1/9/2018 | 1/9/2018 9:44:04 AM | A | FAIL |
|
|
Provide a tagged fire extinguisher as discussed and a racking permit for the storage rack within the building.
Phone #: ###-#### Inspection requested via web by Ryan Steinwand
|
FIR17-00411
| INSP-Final Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 9:17:41 AM | P | PASS |
|
|
Permit finaled
|
BLD16-04310
| FIRE-Final Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 9:17:26 AM | P | PASS |
|
|
Life safety passed.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD16-04310
| FIRE-Final Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 8:03:55 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by David Scaggs Inspection cancelled from web by: David Scaggs
|