ESC16-01417
| Aging Inspection | 1/9/2018 | 1/9/2018 | 1/10/2018 11:02:09 AM | | CANC |
|
|
|
ESC17-00013
| General Inspection | 1/9/2018 | 1/9/2018 | 1/10/2018 10:26:27 AM | | PASS |
|
|
SWPPP says site is inactive. Syman completed inspection for rain event. No issues, all exposed area is below grade and no one is using property.
|
ESC15-00556
| General Inspection | 1/9/2018 | 1/9/2018 | 1/10/2018 10:07:52 AM | | PART |
|
|
Homes being framed on Hakkasan have piles of waste laying around. All foundations have been completed. Neighborhood BMPs in place. Majority of neighborhood clean and completed.
|
ESC15-00306
| General Inspection | 1/5/2018 | 1/9/2018 | 1/9/2018 3:24:51 PM | A | PASS |
|
|
Scope of work has been expanded. More asphalt is being removed and replaced with concrete. BMPs will be installed as they go since activity is linear. Most rip rap work completed and not much if any in water work remaining. Site is well maintained and a crew is onsite taking care of BMPs at all time.
|
ESC16-00617
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 1:47:15 PM | | PASS |
|
|
Pump truck on site, is parked on rock entrance. Cement trucks filling are never leaving asphalt, using washout on lot next door. Some workers parked in mud, will probably cause a mess when they leave. Lots of debris at inlet on sand dune and crestline. Will monitor next few days.
|
ESC16-00353
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 1:38:48 PM | | PART |
|
|
WIP on SFH. Some trackout from a few homes, all workers now parking on street. Neighborhood BMPs in place, some of the gator guard is wearing out. No muddy runoff coming from home sites. There is a bit of sand and dirt in the gutters and on the road, combination from sanding from plows and dirt from site. Streets can use a pass by a sweeper. DIs at bottom of hill need to be maintained, full of leaves and debris.
|
ESC17-00140
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 12:26:40 PM | | PASS |
|
|
WIP. House wrapped in poly. No dirt leaving site.
|
ESC16-00625
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 12:05:30 PM | | PASS |
|
|
WIP. Framers on site. Some dirt on sidewalk and a small pile of wood on lot.
|
ESC15-01138
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 12:01:15 PM | | PASS |
|
|
WIP. Some trash boxes out front, some dirt on sidewalk.
|
ESC17-00190
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 11:40:11 AM | P | PASS |
|
|
Checked during thaw and rain event. Site has held up, no erosion on hill sides or runoff. Road and drives are clean.
|
ESC17-00947
| General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 10:36:08 AM | P | PART |
|
|
WIP. Some dirt on sidewalk, pile of trash next to trash box.
|
ESC16-00724
| Site Final | 1/8/2018 | 1/9/2018 | 1/9/2018 10:21:55 AM | P | PASS |
|
|
|
ESC16-01399
| Aging Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 10:11:16 AM | | PASS |
|
|
No dirt work, area around house still has snow.
|
ESC17-00794
| BMP Violation | 1/9/2018 | 1/9/2018 | 1/9/2018 9:49:23 AM | P | FAIL |
|
|
Mud all over sidewalk and street. Muddy water flowing to unprotected storm drains. Left message with listed RP. Scheduling followup for 1/10. Will shut down project if not fixed.
|
ESC16-01303
| Aging Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 9:47:05 AM | | FAIL |
|
|
Mud all over sidewalk and street. Muddy water flowing to unprotected storm drains. Left message with listed RP. Scheduling followup for 1/10. Will shut down project if not fixed.
|
ESC04-01201
| DOC - Permit Finaled | 1/9/2018 | 1/9/2018 | 1/9/2018 9:36:48 AM | P | PASS |
|
|
|