ELE19-01403
| Electrical Rough-In | 1/9/2020 | 1/9/2020 | 1/9/2020 2:31:14 PM | P | PASS |
|
|
Rough inspection of boxes and raceways in elevated deck pour L3-3. Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
|
ELE19-02136
| Final | 1/8/2020 | 1/9/2020 | 1/9/2020 11:10:10 AM | A | FAIL |
|
|
Final please. Have a bless day Phone #: ###-#### Inspection requested via web by Kyle Lott At Building inspectors request need to address work done under ELE16-02769. This permit expired 5-14-19, a new permit shall be pulled covering this work and an inspection must be performed for this work. Called Kyle's number and left information with his receptionist. 110.3- Baseboard manufactureres instructions states receptacles shall not be located above baseboard heaters. 1 in down office. 210.8- GFCI receptacle devices shall be located where readily accessible. In drinking fountains. 314.29- Ceiling boxes shall be located where accessible. HVAC duct covering misc boxes rendering them not accessible.
|
ELE19-04512
| Final | 1/8/2020 | 1/9/2020 | 1/9/2020 10:13:22 AM | A | PASS |
|
|
Bill Peace is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
ELE20-00099
| Electrical Rough-In | 1/9/2020 | 1/9/2020 | 1/9/2020 9:37:53 AM | A | PASS |
|
|
Install PVC from house to garage. I did tell him he could cover the middle section up but to leave the ends open to see the depth we were at a minimum of 20". He has no dogs gate is unlocked Phone #: ###-#### Inspection requested via web by David Kubik Underground rough in ok cover
|
ELE20-00091
| Temporary Service | 1/8/2020 | 1/9/2020 | 1/9/2020 8:28:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray t/s u/g n ok
|