BLD01-00355
| BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | | PART |
|
|
wip 10/2/2001 8:34:26 AM
|
BLD01-01787
| BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | | PART |
|
|
wip 10/2/2001 8:34:34 AM
|
BLD01-02088
| BLD-Conference | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | CANC |
|
|
###-#### Eva
|
BLD01-02583
| BLD-Footing | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | PART |
|
|
###-#### RICHERD
|
BLD01-01807
| BLD-Framing/Rough-in | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | PART |
|
|
SHEER WALL ###-#### GRANT
ext. sheer ok 10/1/2001 11:40:57 AM
|
BLD01-01702
| BLD-Energy code compliance | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | PART |
|
|
###-#### DALE
ok to cover after sprinklers are signed off 10/1/2001 11:09:29 AM
|
BLD01-01544
| BLD-Energy code compliance | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | PART |
|
|
###-#### JASON
main level only, not upper 10/1/2001 11:59:37 AM
|
BLD01-02570
| BLD-Footing | 9/30/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/30/2001 at 20:01:28. Contact: ###-####.
|
BLD01-02316
| BLD-Foundation | 9/28/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | PART |
|
|
###-#### GUI
verified letter from A.HJ. eng. on soils. //south and s.east 1/2 of wall ok, per plan 10/1/2001 2:29:07 PM
|
BLD01-01546
| BLD-Footing | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | PART |
|
|
matt- ###-#### ft
wip on shop and house ftgs 10/1/2001 3:43:32 PM
|
BLD01-01756
| BLD-Final | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 08:18:28. Contact: ###-####.
need trades, no inspection made 10/1/2001 1:08:46 PM
|
BLD01-02161
| BLD-Energy code compliance | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | NR |
|
|
todd-- ###-#### energy code
|
BLD01-00662
| BLD-Framing/Rough-in | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | PART |
|
|
shear panel ###-####
exterior shear ok 10/1/2001 3:30:11 PM
|
BLD01-02442
| BLD-Foundation | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | PART |
|
|
###-#### JARED SHEER WALL ALSO
poured 10/1/2001 4:31:43 PM
|
BLD01-02096
| BLD-Energy code compliance | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | FAIL |
|
|
energy code jill-- ###-####
reinspection fee imposed, c/n posted, need mechanical permit, gas line- ducting for range etc.///finish prior c/n 10/1/2001 1:59:34 PM
|
BLD01-02204
| BLD-Footing | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-02088
| BLD-Conference | 10/1/2001 | 10/1/2001 | 10/1/2001 12:00:00 AM | P | PASS |
|
|
eva ###-#### 10/1/2001 11:44:09 AM
on shear over sheeting, block and nail as reqd.,, roof collar ties, as drawn or have arch. re-draw (they want to raise ceiling joists/collar ties higher).,,,, and on floor over front room, need to add joists to lessen deflection. 10/1/2001 12:52:28 PM
|