Inspections for the day of: Tuesday, October 1, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-02764 Pressure Test9/30/200210/1/200210/1/2002 12:00:00 AMAPASS
call 1st, caroline ###-####..past franklin 10/1/2002 8:59:18 AM
MEC02-02764 Final9/30/200210/1/200210/1/2002 12:00:00 AMAPASS
###-####
MEC02-01572 Final9/30/200210/1/200210/1/2002 12:00:00 AMAFAIL
rescheduled by 340..curtis..left on targee..right on phillippi 10/1/2002 9:01:14 AM..code #0976 enter...0975 10/1/2002 9:21:27 AM gas flex connector to both furnaces undersized for btu 10/1/2002 11:04:19 AM
MEC02-02698 Pressure Test9/30/200210/1/200210/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/30/2002 at 17:30:45. Contact: ###-####.
MEC02-02763 Final10/1/200210/1/200210/1/2002 12:00:00 AMPPASS
PLEASE INSPECT AS CLOSE TO 3:00PM AS POSSIBLE. CALL BEFORE GOING OUT.
THANKS FOR YOUR HELP
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen..maple grove..right on devonshire 10/1/2002 1:08:00 PM
MEC02-02796 Pressure Test10/1/200210/1/200210/1/2002 12:00:00 AMPNH
###-#### pager kevin please call for access talked to home owner..he will reschedule for later in the week 10/1/2002 1:40:15 PM
MEC02-02656 Rough-in10/1/200210/1/200210/1/2002 12:00:00 AMPPASS
3 gas f/p- joe- cell ###-####
MEC02-02803 Final10/1/200210/1/200210/1/2002 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 10/01/2002 at 11:00:17. Contact: ###-####. doors locked..talked to carol 10/1/2002 4:45:11 PM
MEC02-02794 Pressure Test10/1/200210/1/200210/1/2002 12:00:00 AMPFAIL
###-####- call 1/2 hr before insp brandon .. 10/1/2002 12:36:09 PM...###-#### 10/1/2002 12:37:02 PM leak 10/1/2002 2:45:12 PM
MEC02-02774 Rough-in10/1/200210/1/200210/1/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/01/2002 at 11:13:57. Contact: ###-####. posted corrections..talked to worker 10/1/2002 4:17:19 PM
MEC02-02774 Pressure Test10/1/200210/1/200210/1/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 10/01/2002 at 11:14:17. Contact: ###-####.
MEC02-02694 Final9/27/200210/1/200210/1/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/27/2002 at 15:59:14. Contact: ###-####. condensate tubing to drain to approved location...talked to will 10/1/2002 2:59:33 PM
MEC02-02788 Final9/30/200210/1/200210/1/2002 12:00:00 AMPPASS
PLEASE INSPECT AROUND 1:00 P.M. IF THAT IS NOT POSSIBLE, PLEASE CALL AND LET US KNOW. THANK YOU; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS