PLM02-02881
| Plumbing Rough-in | 9/30/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 11:45:40. Contact: ###-####.
|
PLM02-02021
| Water and/or Sewer | 9/30/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### sewer line. need to test inlet and outlet line. change vent from intercepter to pvc piping. call for reinspection. 10/2/2002 2:17:01 AM
|
PLM02-02455
| Plumbing Rough-in | 10/1/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 07:46:32. Contact: ###-####.
|
PLM02-02988
| Sprinkler (Final) | 10/1/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | PASS |
|
|
mark ###-####
|
PLM02-02945
| Water and/or Sewer | 10/1/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 08:42:40. Contact: ###-####.
|
PLM02-02995
| Water and/or Sewer | 10/1/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | PASS |
|
|
###-#### shelby
|
PLM02-02208
| Roof Drains | 10/1/2002 | 10/1/2002 | 10/1/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 10:57:19. Contact: ###-####. change clean out risors to sch 40 to 12 inches from grade. (5) 10/2/2002 3:20:09 AM
|