BLD03-00094
| FIRE-Final Inspection | 9/30/2003 | 10/1/2003 | 10/1/2003 12:00:00 AM | A | PASS |
|
|
life safety finaled 10/1/2003 10:37:26 AM
|
FIR03-00357
| INSP-Alarm Testing | 9/30/2003 | 10/1/2003 | 10/1/2003 12:00:00 AM | A | FAIL |
|
|
provide nfpa 72 forms, supervise all batteries, verify current draw 10/1/2003 1:10:28 PM
|
FIR03-00367
| INSP-Sprinkler Rough-in/Hydro | 10/1/2003 | 10/1/2003 | 10/1/2003 12:00:00 AM | P | PART |
|
|
Underground hydro test is OK 10/1/2003 12:43:43 PM
|
FIR03-00367
| INSP-Supply line flush | 10/1/2003 | 10/1/2003 | 10/1/2003 12:00:00 AM | P | PART |
|
|
Underground supply line flush is OK 10/1/2003 12:44:24 PM
|
BLD03-00482
| FIRE-Final Inspection | 10/1/2003 | 10/1/2003 | 10/1/2003 12:00:00 AM | P | FAIL |
|
|
Still need permanent building address and suite numbers for a life/safety sign off.
|