FIR07-00247
| FIR-Aging Inspection | 10/1/2007 | 10/1/2007 | 10/3/2007 11:36:08 AM | | DEFR |
|
|
|
FIR07-00797
| INSP-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 4:10:50 PM | P | PASS |
|
|
Fire sprinkler work passed, permit finaled.
|
FIR07-00425
| INSP-Sprinkler Rough-in | 10/1/2007 | 10/1/2007 | 10/1/2007 3:58:48 PM | P | PART |
|
|
First and second floors are okay for cover as noted, one DSW at each level is not installed, one head to be added at the 1st floor, also discussed roof hose connection.
|
FIR07-00681
| INSP-Sprinkler Rough-in | 9/28/2007 | 10/1/2007 | 10/1/2007 2:38:32 PM | P | PART |
|
|
Fire sprinkler modifications at the drop ceilings are okay for cover, noted three heads not yet complete at hard lid areas, upright coverage for the mezz. storage area is not shown on plans or installed at this time, need to provide area separation as discussed with the general contractor.
|
FIR07-00623
| INSP-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 2:34:07 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD07-00494
| FIRE-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 2:33:16 PM | P | FAIL |
|
|
Need project related fire alarm and hood suppression system permits finaled prior to life safety approval.
|
BLD06-02555
| FIRE-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 2:31:42 PM | P | PASS |
|
|
Fire life safety is satisfactory, noted two fire extinguishers on site to be installed per review notes and plan annotations sheet A2.2, can be verified at structural final.
|
FIR07-00554
| INSP-Final Inspection | 10/1/2007 | 10/1/2007 | 10/1/2007 2:28:02 PM | P | PASS |
|
|
Fire sprinkler work passed final inspection, permit finaled.
|
BLD07-00494
| FIRE-Final Inspection | 9/28/2007 | 10/1/2007 | 10/1/2007 11:20:09 AM | A | CANC |
|
|
###-#### - mike Note: hood final Not ready for inspection per phone call from contractor due to electrical issues.
|
FIR07-00737
| INSP-Conference | 10/1/2007 | 10/1/2007 | 10/1/2007 11:14:22 AM | A | DONE |
|
|
On site conference to discuss project shell and tenant work interface, also discussed second floor ceilings.
|
FIR07-00729
| INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/1/2007 | 10/1/2007 11:11:26 AM | A | PART |
|
|
Fire sprinkler system modifications are approved for cover at the drop ceilings.
|
FIR07-00661
| INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/1/2007 | 10/1/2007 11:10:04 AM | A | PART |
|
|
Overhead install is acceptable, need as-built plans showing field modifications at the escalator.
|