FIR05-00536
| INSP-Sprinkler Rough-in | 10/1/2007 | 10/1/2007 | 10/2/2007 2:10:52 PM | P | PASS |
|
|
See the city approved plans for the locations on the 8th floor south half where the sprinkler piping is ok to cover.
|
BLD05-00633
| FIRE-Final Inspection | 9/28/2007 | 10/1/2007 | 10/2/2007 11:27:46 AM | A | FAIL |
|
|
I walked through the phase 1 areas with Wayne and looked at the placement of exit signs, fire extinguishers and door hardware only. See the city approved plans for locations of deficiencies. I also noted the lack of emergency lights and exit signs on the roof top which exits people to the stairwells. An emergency generator test of the emergency lighting will need to be scheduled.
|
FIR06-00813
| INSP-Final Inspection | 9/28/2007 | 10/1/2007 | 10/1/2007 3:12:52 PM | A | FAIL |
|
|
See Ken's notes on the city approved plans for items tested and deficiencies found.
|
FIR06-00812
| INSP-Final Inspection | 9/28/2007 | 10/1/2007 | 10/1/2007 3:12:13 PM | A | FAIL |
|
|
See Ken's notes on the city approved plans for items tested and deficiencies found.
|
FIR07-00583
| INSP-Sprinkler Rough-in | 9/28/2007 | 10/1/2007 | 10/1/2007 3:10:01 PM | P | PASS |
|
|
The sprinkler piping is ok to cover. Again as with the other buildings the sidewall sprinkler elevations under the outside patios need addressed.
|
BLD07-01972
| FIRE-Final Inspection | 9/28/2007 | 10/1/2007 | 10/1/2007 1:34:05 PM | A | PASS |
|
|
fire life safety passed
|
FIR07-00602
| INSP-Final Inspection | 9/28/2007 | 10/1/2007 | 10/1/2007 11:53:10 AM | A | PASS |
|
|
permit finaled
|