Inspections for the day of: Thursday, October 1, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01546 BLD-Foundation10/1/200910/1/200910/1/2009 5:59:16 PMPPASS
Bill ###-####
BLD09-00684 BLD-Final10/1/200910/1/200910/1/2009 5:57:08 PMPPASS
KAthy Phone #: ###-####
BLD09-00684 DOC - Permit Finaled10/1/200910/1/200910/1/2009 5:56:56 PMPPASS
BLD09-01656 BLD-Final9/30/200910/1/200910/1/2009 5:03:14 PMPPASS
Tim - call for access Phone #: ###-####
OK for Perm Occ.
BLD09-00323 BLD-Framing/Rough-in9/30/200910/1/200910/1/2009 1:47:01 PMAPART
travis - shear reinspection - please call with results Phone #: ###-####
C/N Partial shear insp only...Exterior and interior shear wall nailing OK above floor line. Contractor to ascertain that all J bolts, hold down devices and straps are in place prior to calling for insp of walls.... and pony walls in crawlspace. Provide letter for special insp of epoxy bolting at next inspection.
BLD09-00461 BLD-Energy code compliance9/30/200910/1/200910/1/2009 1:38:06 PMAPASS
Brandon Phone #: ###-####
North wing OK.
BLD09-01025 BLD-Final9/30/200910/1/20099/30/2009 4:39:07 PMPNR
marvin Phone #: ###-####
Need Fire Final
MIS09-00176 BLD-Conference9/29/200910/1/20099/30/2009 1:51:17 PMAPASS
Check on C/N issued and left on site.........NH Shed measured 8x15.....120 sq ft......Bldg permit not required.