ESC09-00444
| General Inspection | 10/1/2009 | 10/1/2009 | 10/1/2009 3:49:04 PM | P | PASS |
|
|
looked ok
|
ELE09-01869
| Final | 10/1/2009 | 10/1/2009 | 10/1/2009 3:24:18 PM | P | CANC |
|
|
Kurt ###-#### see ri, no esc this project
|
ELE09-01869
| Electrical Rough-In | 10/1/2009 | 10/1/2009 | 10/1/2009 3:23:30 PM | P | PASS |
|
|
Kurt ###-#### ric ok, will call for final later, no esc this project
|
ELE09-01860
| Conference | 10/1/2009 | 10/1/2009 | 10/1/2009 1:03:56 PM | P | DONE |
|
|
Suzanne Chetwood ###-#### talked about requirements to hook up hot tub in back yard, grounding, bonding, raceways, wiring, access to tub, disconnect, convenience receptacle, in-use cover. Hot tub is listed. Kiln installation is ok. No esc this project.
|
ELE09-01494
| Electrical Rough-In | 9/30/2009 | 10/1/2009 | 10/1/2009 10:46:37 AM | A | PASS |
|
|
Jim Phone #: ###-#### Bod the electric permit that was attached to this building permit was on the wrong address I think we have it rignt now. ric ok up and down, no esc this project
|
ELE09-01669
| Final | 9/30/2009 | 10/1/2009 | 10/1/2009 9:50:01 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Clint Tate ok to final, signed cards, no esc this project
|
ELE09-01194
| Final | 9/30/2009 | 10/1/2009 | 10/1/2009 9:23:57 AM | A | PASS |
|
|
taggart Phone #: ###-#### ok to final, no esc this project
|
ELE09-01532
| Final | 9/30/2009 | 10/1/2009 | 10/1/2009 8:53:28 AM | A | PASS |
|
|
rick Phone #: ###-#### ok to final, no esc this project
|
ELE09-01861
| Electrical Rough-In | 9/30/2009 | 10/1/2009 | 10/1/2009 8:30:17 AM | A | PART |
|
|
ready for U/G inspection Phone #: ###-#### Internet Inspection Request from: gary batten ok to cover u/g under garage only, called contractor, will see rest of u/g later
|
ELE09-01856
| Electrical Rough-In | 9/30/2009 | 10/1/2009 | 10/1/2009 8:04:17 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jenni Keller corrections made, ric ok, no esc this project
|