Inspections for the day of: Thursday, October 1, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00462 INSP-Final Inspection9/30/200910/1/200910/1/2009 4:01:33 PMPPASS
permit finaled
FIR09-00448 INSP-Sprinkler Rough-in10/1/200910/1/200910/1/2009 3:22:16 PMPPASS
The remaing sprinkler piping can be covered. The tenting is complete.
FIR09-00097 INSP-Alarm Testing10/1/200910/1/200910/1/2009 2:42:26 PMPPASS
All of the smoke alarms were tested today as well as all of the fire sprinkler to fire alarm panel interconnections. There are two items left that need addressed. They are the shutters on the third floor atrium and the non-syncing of the horn/strobes in the first floor common areas and the handi-cap rooms.
FIR08-00830 INSP-Final Inspection9/30/200910/1/200910/1/2009 1:58:31 PMAFAIL
The forward flush passed and the interconnections to the fire alarm panel passed inspection. This included tripping both of the dry pipe systems. I noted that the air compressor on the first floor dry system does not match plan. I was unable to verify all of the typical finish items on a final inspection due to time constraints. Lonnie will call back in when the air compressor issue has been addressed.
BLD09-01536 FIRE-Final Inspection9/30/200910/1/200910/1/2009 1:36:28 PMAFAIL
Provide passage hardware as per note #19 on the intermediate door. Remove the thumbturn dead bolt and provide the sticker as discussed at the south exit.
BLD09-00489 FIRE-Final Inspection9/30/200910/1/200910/1/2009 11:56:29 AMAFAIL
All life safety items are ok except not all of the resident room doors release/close upon activation of the fire alarm system. Contractor was going to tighten hinges and call in for tomorrow.
BLD09-01025 FIRE-Final Inspection9/30/200910/1/200910/1/2009 11:48:53 AMAPASS
life safety passed
FIR08-00831 INSP-Final Inspection9/30/200910/1/200910/1/2009 11:47:16 AMAPASS
permit finaled
FIR08-00832 INSP-Final Inspection9/30/200910/1/200910/1/2009 11:46:44 AMAPASS
permit finaled
FIR09-00475 INSP-Alarm Testing9/30/200910/1/200910/1/2009 11:33:27 AMAPASS
Permit finaled
FIR09-00474 INSP-Alarm Testing9/30/200910/1/200910/1/2009 11:32:59 AMAPASS
permit finaled