BLD10-01348
| FIRE-Final Inspection | 10/1/2010 | 10/1/2010 | 10/4/2010 2:42:28 PM | P | PASS |
|
|
life safety passed.
|
BLD10-01343
| FIRE-Final Inspection | 10/1/2010 | 10/1/2010 | 10/4/2010 2:42:00 PM | P | PASS |
|
|
life safety passed
|
FIR10-00375
| INSP-Final Inspection | 10/1/2010 | 10/1/2010 | 10/1/2010 4:04:56 PM | P | PASS |
|
|
permit passed
|
FIR10-00363
| INSP-Final Inspection | 10/1/2010 | 10/1/2010 | 10/1/2010 4:03:42 PM | P | PASS |
|
|
permit finaled
|
BLD10-02302
| FIRE-Final Inspection | 10/1/2010 | 10/1/2010 | 10/1/2010 4:03:03 PM | P | PASS |
|
|
life safety passed.
|
FIR10-00407
| INSP-Sprinkler Rough-in | 9/30/2010 | 10/1/2010 | 10/1/2010 12:45:13 PM | A | PASS |
|
|
The connection to the United Water tie in is ok to cover.
|
FIR10-00453
| INSP-Final Inspection | 9/30/2010 | 10/1/2010 | 10/1/2010 10:53:12 AM | A | PASS |
|
|
Permit finaled. The netcon was a 5.
|
BLD10-01852
| FIRE-Final Inspection | 9/30/2010 | 10/1/2010 | 10/1/2010 10:19:52 AM | A | PASS |
|
|
Life safety passed. What has been marked as an office in the basement actually has a sign showing it is a conference room. Plan review did not answer the phone so per my understanding of the code the 364 sq. ft. room can be divided by 15 sq. ft. per occupant which is 25 occupants. This is under the 50 person threshold for doors swinging out and panic hardware requirements.
|
FIR10-00452
| INSP-Final Inspection | 9/30/2010 | 10/1/2010 | 10/1/2010 9:49:33 AM | A | PASS |
|
|
Permit finaled. The netcon was a 5.
|
FIR10-00454
| INSP-Final Inspection | 9/30/2010 | 10/1/2010 | 10/1/2010 9:48:29 AM | A | PASS |
|
|
Permit finaled. The netcon was a 5.
|
BLD10-02249
| FIRE-Final Inspection | 9/30/2010 | 10/1/2010 | 10/1/2010 9:19:41 AM | A | PASS |
|
|
Life safety passed.
|