ESC10-00674
| Site Final | 9/30/2010 | 10/1/2010 | 10/1/2010 5:17:25 PM | A | CANC |
|
|
Moved until 10/5/2010
|
ESC10-00740
| Site Preparation | 10/1/2010 | 10/1/2010 | 10/1/2010 3:46:00 PM | | FAIL |
|
|
VERbal to RP: Protect storm drain inlet wit happroved inlet protection. Install a sediment barrier along the ditch. Will re-inspect on 10/4/2010 pm.
|
ESC10-00672
| Conference | 9/29/2010 | 10/1/2010 | 10/1/2010 2:02:47 PM | A | FAIL |
|
|
Verbal to RP: Maintain inlet protection within the alley way. Clean up all concrete residual within the valley gutter into the storm drain. Provide sediment barrier throught there project area where slopes are over 2% grade slopes. Will re-inspect on 10/4/2010am.
|
ESC10-00739
| Site Preparation | 9/30/2010 | 10/1/2010 | 10/1/2010 2:00:00 PM | A | NR |
|
|
|
ESC10-00741
| Site Preparation | 10/1/2010 | 10/1/2010 | 10/1/2010 1:50:08 PM | | FAIL |
|
|
Verbal to RP: 1. Post ESC sign at the front of project area where it is visable from the street. 2. Remove all sediment and debris that was used for a land bridge. 3. Install a sediment barrier at the access point to the back yard. Will re-inspect on 10/4/2010pm.
|
ESC10-00632
| Site Preparation | 10/1/2010 | 10/1/2010 | 10/1/2010 1:46:53 PM | | PASS |
|
|
|
ESC10-00013
| General Inspection ESC | 10/1/2010 | 10/1/2010 | 10/1/2010 11:49:26 AM | | PASS |
|
|
Have initiated stabilization of all disturded areas..
|
ESC10-00531
| BMP Violation | 9/30/2010 | 10/1/2010 | 10/1/2010 10:59:09 AM | A | PART |
|
|
mUST ADD STAKES TO THE INSTALLED WATTLE.
|