FIR12-00494
| INSP-Sprinkler Rough-in | 10/1/2012 | 10/1/2012 | 10/1/2012 3:46:06 PM | P | PASS |
|
|
See the city approved plans for the location where sprinkler piping can be covered which has been clouded in red and given todays date. Also see adjacent location where three corrections will be required prior to a cover approval being given.
|
BLD12-02590
| FIRE-Final Inspection | 10/1/2012 | 10/1/2012 | 10/1/2012 3:28:25 PM | P | FAIL |
|
|
Annual inspection for the fire extinguisher is needed.
|
FIR12-00538
| INSP-Sprinkler Rough-in | 10/1/2012 | 10/1/2012 | 10/1/2012 3:21:00 PM | P | PASS |
|
|
Sprinkler piping above the hardlids in this scope of work is ok to cover.
|
FIR12-00556
| INSP-Sprinkler Rough-in | 10/1/2012 | 10/1/2012 | 10/1/2012 2:08:41 PM | P | PASS |
|
|
Sprinkler piping within the scope of work can be covered.
|
FIR12-00395
| INSP-Sprinkler Rough-in | 9/28/2012 | 10/1/2012 | 10/1/2012 1:39:14 PM | A | FAIL |
|
|
Third floor tenting has not been repaired or completed. Piping can not be covered.
|
FIR12-00417
| INSP-Sprinkler Rough-in | 9/28/2012 | 10/1/2012 | 10/1/2012 1:38:18 PM | A | PART |
|
|
First and second floor sprinkler rough-in passed. One pendant was missing on the second floor but can be verified at the next rough-in inspection. Third floor hydraulic calculations need to be re-verified due to pipe routing changes in the remote area. Also tenting has not been done for the third floor or any of the heat trace tape. First and second floor piping can be covered except for the areas where heat trace will need to be inspected.
|
BLD12-02370
| FIRE-Final Inspection | 9/28/2012 | 10/1/2012 | 10/1/2012 9:33:47 AM | A | PASS |
|
|
Life safety passed
|
BLD12-01441
| FIRE-Final Inspection | 9/28/2012 | 10/1/2012 | 10/1/2012 9:33:20 AM | A | PASS |
|
|
Life safety passed
|
FIR12-00231
| FIR-Aging Inspection | 10/1/2012 | 10/1/2012 | 10/1/2012 8:13:51 AM | | NR |
|
|
Per Mary, she is waiting for a call back from Albertsons and then will schedule the inspection.
|
FIR12-00490
| INSP-Sprinkler Rough-in/Hydro | 9/28/2012 | 10/1/2012 | 10/1/2012 8:00:21 AM | A | CANC |
|
|
Need an Underground Hydro inspection 1st thing in the morning if possible - Brian Dunham is the contact at 570.0497 Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Scott Carter II
|