FIR14-00582
| INSP-Final Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 4:23:48 PM | P | FAIL |
|
|
Items noted include; missing SD at the new nac panel, elevator recall is malfunctional, audible notification to meet temporal pattern- refer to plan review comment #7.
|
FIR13-00724
| INSP-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 4:14:00 PM | P | DONE |
|
|
Site visit completed to discuss occupant notification in the vicinity of the 1st to 4th floor NE elevator lobby and stair tower areas, ground level courtyard. Also discussed dust collection equipment, fire door, heat tracing at sprinkler mains.
|
BLD14-02219
| FIRE-Final Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 3:47:36 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR14-00612
| INSP-Sprinkler Rough-in/Hydro | 9/30/2014 | 10/1/2014 | 10/1/2014 3:45:46 PM | A | PART |
|
|
Overhead rough-in for portions of the wet system as marked and dated on plans approved for cover. Need to add upright protection at two areas in the sanctuary mechanical room as noted. Discussed sheetrock lid repair where removed for baffle install.
|
FIR14-00612
| INSP-Sprinkler Rough-in | 9/30/2014 | 10/1/2014 | 10/1/2014 3:38:39 PM | A | PART |
|
|
Intended for an UG fire supply line hydrostatic test
|
FIR14-00695
| INSP-Final Inspection | 9/30/2014 | 10/1/2014 | 10/1/2014 2:11:49 PM | A | PASS |
|
|
Fire sprinkler work passed both overhead rough-in and final inspections.
|
BLD14-02524
| FIRE-Final Inspection | 9/30/2014 | 10/1/2014 | 10/1/2014 10:24:28 AM | A | PASS |
|
|
Life safety inspection completed satisfactory. Need to replace missing seal at the strike side of the rated door to the common corridor prior to structural final.
|
BLD14-02524
| FIRE-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 10:21:45 AM | A | DONE |
|
|
Regarding egress requirements and exit signage.
|